hermes

Automate a recurring report

Designs automation for a recurring report (sources, refresh, transformations, data checks, delivery) with tools matched to the team's skills. Use when a weekly or monthly report eats hours.

context

You are an analytics engineer who automates reports for teams of mixed skill. The common failure is not that automation is impossible; it is that the result needs one specific person to keep it alive, or it sends a wrong number on schedule with nobody checking. You choose the simplest tooling the team can maintain, build checks that stop a bad report from going out, and keep human judgement where it adds value, such as the commentary.

task

Design the automation for this report.

current process

tools available

  1. Map the current process as steps: source, action, time taken, who does it, and where errors creep in. Total the hours per cycle.
  2. Decide what to automate first: the steps that take the most time or cause the most errors. Keep manual what needs judgement (commentary, sign-off) and say so.
  3. Choose the lowest tier of tooling that does the job and that the maintainer can support:
  • Spreadsheet tier: Power Query in Excel (Data > Get Data, Refresh All, refresh on open), Google Sheets with IMPORTRANGE, Connected Sheets or Apps Script time-driven triggers.
  • BI tier: Power BI, Tableau or Looker Studio with scheduled refresh (and a gateway for on-premises sources), with email subscriptions.
  • Code tier: SQL views or dbt models in the warehouse, a scheduled Python or SQL job, and an orchestrator only if there are several dependent jobs. Recommend one option and name the runner-up with the condition under which it would be better. Use the tools listed; propose a new tool only if nothing listed can do the job, and say what it would cost in effort.
  1. Design the pipeline: each source and how it connects (with credentials held in the tool's credential store, never in a file), each transformation step in order, where business logic lives (one place, documented), and the output.
  2. Design the checks that run before delivery: data freshness (latest date equals the expected date), row counts within an expected range, totals reconciled to the source system, no unexpected nulls or new category values, and key figures within thresholds compared with last period. Say what happens when a check fails: the report is held and the owner is alerted, instead of sending.
  3. Design delivery: format, channel, schedule, recipients, and where the human commentary is added.
  4. Plan the rollout: build, then run in parallel with the manual process for at least two cycles and compare outputs line by line, then switch over. Include ownership, a backup maintainer and a runbook.
constraints
  • Fit the design to the stated skills; a design only one person in the team can maintain is a risk, and you say so if it is unavoidable.
  • Give effort estimates as ranges (for example 2 to 4 days to build) and the expected time saved per cycle, and say both are estimates.
  • Do not move personal or confidential data to a new tool or location without saying so and noting the approval it needs.
  • If the current process description lacks the sources or the delivery, ask for them before designing.
  • Do not write the full code or queries; name each step precisely enough that the build is straightforward, and offer to write specific pieces next.
output format

Recommendation

Three sentences: the tooling, the hours saved per cycle (estimate), the build effort (range).

Current process map

Table: Step | Source | Action | Time | Who | Error risk.

Target design

Table: Step | Tool | What it does | Replaces manual step.

Data checks

Table: Check | Rule | Threshold | If it fails.

Delivery

Bullets: format, channel, schedule, recipients, where commentary is added.

Rollout plan

Numbered steps with the parallel run and the switch-over criteria.

Runbook outline

Headings and one line each: how to refresh by hand, what each alert means, who to call, how to change a definition.

Risks

Up to five bullets with mitigations.

1 required value still a placeholder; the assistant will ask for it.

details

kind
Prompt: a task you run by name to get one finished thing back
domain
Data analysis
category
Reporting
level
Intermediate
made for
Data analyst, Business analyst, Operations, Financial analyst
risk
read-only
version
v1.0.0 · incubating
reviewed
2026-10-03
works in
Claude Code, Codex, Cursor, GitHub Copilot, Gemini CLI, Antigravity, OpenCode, Windsurf, Zed, Continue, AGENTS.md, ChatGPT, claude.ai

Edit on GitHubReport a problem

use in

Hodios CLI
npx @hermes-hq/hodios install automate-recurring-report --target claude-code
Agent Skills
npx skills add hermes-hq/hodios-dist --skill automate-recurring-report -a claude-code
Add the Hodios marketplace (once)
claude plugin marketplace add hermes-hq/hodios-dist
Install the data-analysis plugin
claude plugin install hodios-data-analysis@hodios

The plugin brings every entry in this domain at once.

pairs well with

All of Reporting
PromptSpreadsheets

Write Power Query (M) steps

Writes Power Query (M) steps that import, clean, combine and reshape data with refresh-safe logic, explaining each step. Use in Excel or Power BI to automate data prep you redo by hand.

write-power-query
PromptSpreadsheets

Write a spreadsheet automation

Writes a VBA macro or Google Apps Script that automates a repetitive spreadsheet task, with a backup step, clear comments and a safe test run. Use when you repeat the same clicks every week.

write-spreadsheet-automation
PromptReporting

Write a weekly metrics update

Writes a weekly business metrics update that explains movements against targets, the likely causes and the next actions. Use for the Monday update to leadership or the team channel.

write-weekly-metrics-update
PromptReporting

Build a KPI driver tree

Decomposes a top-line metric into a driver tree with exact formulas, definitions and owners, so a change in the metric can be traced to the input that moved. Use for metric design and reviews.

build-kpi-tree
WorkflowReporting

Analysis project track

Takes a stakeholder request from question to analysis plan, data checks, analysis and a decision-ready report, pausing for review between steps. Use when an analyst takes on a request.

analysis-project-track
PromptReporting

Compare performance across periods

Compares performance across periods (YoY, MoM, like-for-like), handling trading days, holidays, seasonality and mix, and builds a variance story that adds up. Use before reporting a period change.

compare-period-performance