# Hodios paste pack: Forecasting

Everything in Forecasting from Hodios, the open prompt library by Hermes IDE: 56 entries, catalog 2026.1014.1.

Every entry is dedicated to the public domain under CC0 1.0. Copy, change and share them freely, no attribution needed.

Browse and search the library at https://hermes-ide.com/prompts

## How to use

Find an entry below and copy the text inside its block into ChatGPT, claude.ai or any chat. Replace each [PLACEHOLDER] with your own material. Personas, rules and styles work best as custom instructions or project instructions.

## Contents

- Forecasting
  - [Adjust a forecast for known events](#add-event-adjustments-to-forecast) (prompt)
  - [Adjust a forecast for weather](#adjust-forecast-for-weather) (prompt)
  - [Build a driver-based revenue forecast](#build-driver-based-revenue-forecast) (prompt)
  - [Build a forecast in Excel or Google Sheets](#forecast-in-excel) (prompt)
  - [Build a Prophet forecast in Python](#build-prophet-forecast) (prompt)
  - [Build features for an ML forecasting model](#build-ml-forecasting-features) (prompt)
  - [Build next year's sales budget](#build-sales-budget-forecast) (prompt)
  - [Choose a forecasting method](#choose-forecasting-method) (prompt)
  - [Clean demand history before forecasting](#clean-demand-history) (prompt)
  - [Combine several people's forecasts](#combine-expert-forecasts) (prompt)
  - [Compare forecast models by backtest](#compare-forecast-models-by-backtest) (prompt)
  - [Diagnose a forecast miss](#diagnose-forecast-miss) (prompt)
  - [Document a forecast model](#document-forecast-model) (prompt)
  - [Forecast a campaign's results](#forecast-marketing-campaign-results) (prompt)
  - [Forecast a project's cost at completion](#forecast-project-cost-at-completion) (prompt)
  - [Forecast a time series](#forecast-time-series) (prompt)
  - [Forecast active users from retention](#forecast-active-users-from-retention) (prompt)
  - [Forecast billable utilisation and fee income](#forecast-billable-utilisation) (prompt)
  - [Forecast bookings from pickup pace](#forecast-bookings-from-pickup) (prompt)
  - [Forecast cloud spend](#forecast-cloud-spend) (prompt)
  - [Forecast contact centre volume by interval](#forecast-contact-volume) (prompt)
  - [Forecast cost inflation for a budget](#forecast-cost-inflation-for-budget) (prompt)
  - [Forecast demand for a new product](#forecast-new-product-demand) (prompt)
  - [Forecast event attendance](#forecast-event-attendance) (prompt)
  - [Forecast from a short history](#forecast-from-short-history) (prompt)
  - [Forecast fundraising income](#forecast-fundraising-income) (prompt)
  - [Forecast headcount month by month](#forecast-headcount) (prompt)
  - [Forecast infrastructure capacity needs](#forecast-infrastructure-capacity) (prompt)
  - [Forecast intermittent demand](#forecast-intermittent-demand) (prompt)
  - [Forecast quarter-end sales from pipeline](#forecast-quarter-close-from-pipeline) (prompt)
  - [Forecast restaurant covers](#forecast-restaurant-covers) (prompt)
  - [Forecast returns and warranty claims](#forecast-returns-and-warranty-claims) (prompt)
  - [Forecast sales for a new location](#forecast-new-location-sales) (prompt)
  - [Forecast school enrolment](#forecast-school-enrollment) (prompt)
  - [Forecast sell-through and markdown timing](#forecast-sell-through-for-markdowns) (prompt)
  - [Forecast subscription revenue by cohort](#forecast-subscription-revenue) (prompt)
  - [Forecast thousands of series in Python](#forecast-many-series-in-python) (prompt)
  - [Forecast website traffic](#forecast-website-traffic) (prompt)
  - [Forecast with leading indicators](#forecast-with-leading-indicators) (prompt)
  - [Forecast with planned drivers](#forecast-with-causal-drivers) (prompt)
  - [Forecaster](#forecaster) (persona)
  - [Make a calibrated forecast](#make-calibrated-forecast) (prompt)
  - [Make a forecast](#make-forecast) (prompt)
  - [Measure forecast accuracy](#measure-forecast-accuracy) (prompt)
  - [Monitor a live forecast for drift](#monitor-forecast-drift) (prompt)
  - [Predict customer lifetime value](#predict-customer-lifetime-value) (prompt)
  - [Present forecast uncertainty](#present-forecast-uncertainty) (prompt)
  - [Project month-end results from partial data](#project-month-end-from-partial-data) (prompt)
  - [Project service demand from demographics](#project-service-demand-from-demographics) (prompt)
  - [Project when a metric hits a target](#project-growth-to-milestone) (prompt)
  - [Reconcile top-down and bottom-up forecasts](#reconcile-top-down-and-bottom-up-forecasts) (prompt)
  - [Review a forecast's assumptions](#review-forecast-assumptions) (prompt)
  - [Run a monthly forecast cycle](#forecast-cycle-track) (workflow)
  - [Score probability forecasts](#score-probability-forecasts) (prompt)
  - [Size a one-time seasonal buy](#size-seasonal-buy-quantity) (prompt)
  - [Write forecast commentary](#write-forecast-commentary) (prompt)

---

<a id="add-event-adjustments-to-forecast"></a>

## Adjust a forecast for known events

`add-event-adjustments-to-forecast` · prompt · Forecasting · https://hermes-ide.com/prompts/add-event-adjustments-to-forecast

Adjusts a baseline forecast for promotions, price changes, moving holidays and other known events, sized from past analogues, with pull-forward and cannibalisation and a log for later review.

````markdown
<context>
Manual adjustments to a statistical forecast are justified only for information the model cannot know: a promotion next month, a price change, a new store. Studies of company forecasting have repeatedly found that many adjustments make forecasts worse: small tweaks add noise and optimistic upward changes add bias, while large adjustments backed by specific information tend to help. The common mistakes are double counting (adding a Christmas uplift to a seasonal model that already has Christmas in it), sizing uplift from hope instead of past events, forgetting the dip before a promotion (customers wait) and after it (pantry loading pulls demand forward), forgetting that a promoted item cannibalises its neighbours, and placing moving holidays (Easter, Ramadan, Lunar New Year, Diwali) in the wrong weeks. Every adjustment should be logged with its reason and owner so its value can be checked afterwards.

<baseline>
[BASELINE_FORECAST]
</baseline>

<events>
[EVENTS]
</events>
</context>

<task>
1. For each event, decide whether the baseline already captures it (recurring holidays in a seasonal model, a regular monthly promotion that is in the history) and whether a moving holiday falls in a different period from last year. Adjust only what is new or shifted.
2. Size each remaining adjustment from the history: uplift during the event as a ratio to baseline, the dip before, the dip after, and the effect on related items. If there is no history, give a cautious range and label it as judgment.
3. Apply the adjustments period by period, keeping the baseline, each adjustment and the final forecast as separate columns so they can be audited.
4. Check the net effect: total demand across the event window and the item group, after pull-forward and cannibalisation, is usually much smaller than the headline uplift. Report it.
5. Write the adjustment log: event, periods, size, evidence, owner, and the actual to compare against.
6. Set up the review: after the event, compare baseline, adjusted forecast and actual, and say what result would show the adjustment helped.
</task>

<constraints>
- Do not adjust for something already in the baseline; explain any case where you are unsure.
- Never size uplift from the promotion's target or a sales team's wish; use history, or a labelled judgment range.
- Do not make small adjustments (within normal forecast error) unless there is specific information; say when the right answer is "leave the baseline".
- Keep units and periods consistent with the baseline.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Net change in demand over the event window, the largest adjustment, and any adjustment you advise against.

## Already in the baseline?
Table: event | in baseline? | reason | action.

## Adjustments
Table: event | periods | during | before dip | after dip | cannibalisation | evidence.

## Adjusted forecast
Table: period | baseline | each adjustment | final.

## Adjustment log
Table: event | size | evidence | owner | compare against.

## Review after the event
Bullets.
</output_format>
````

---

<a id="adjust-forecast-for-weather"></a>

## Adjust a forecast for weather

`adjust-forecast-for-weather` · prompt · Forecasting · https://hermes-ide.com/prompts/adjust-forecast-for-weather

Measures how much temperature, rain or sunshine really moves demand for a weather-sensitive business, and adds that effect to a short-range forecast using weather forecasts honestly.

````markdown
<context>
Weather moves demand for ice cream, garden centres, beer gardens, heating, umbrellas and many services, but people overestimate it because they remember the extremes. Two traps are common. First, weather and season are confounded: summer is both warm and the holiday season, so a naive regression of sales on temperature attributes the seasonal pattern to temperature; the weather effect must be measured as a deviation from what is normal for the time of year (anomaly against seasonal norm). Second, the relationship is rarely linear: demand often responds only above or below a threshold (degree-days for heating and cooling), rain matters more on weekends, and a hot day after a cold spell lifts more than the same day in a heatwave. Using the effect also needs care: weather forecasts lose skill quickly beyond a few days, so a weather adjustment helps short-range ordering and staffing but should fade back to the seasonal norm for longer horizons.

Use: [USE]
Tool: none
</context>

<task>
<sales_and_weather>
[SALES_AND_WEATHER]
</sales_and_weather>

1. Check the data: matching dates and location, enough history to cover a range of weather in each season, closures and events to exclude.
2. Remove the seasonal and weekly pattern first (for example compare each day with the same weekday's typical level for that time of year), then relate the remaining deviation to weather anomalies.
3. Test the shape: thresholds, degree-days, rain as a yes or no versus amount, weekday versus weekend differences. Report the effect in business terms ("each degree above 22°C adds about X units on weekends").
4. Check that the weather effect improves out-of-sample accuracy over the seasonal baseline; if it does not, say the business is less weather-sensitive than assumed.
5. Describe how to apply it: take the baseline forecast, add the effect from the weather forecast for the next few days, and fade to the seasonal norm beyond the reliable range of the weather forecast.
6. Provide code or spreadsheet steps if a tool is chosen.
</task>

<constraints>
- Compute only from data supplied; never quote typical weather sensitivities from memory as if measured.
- Never regress raw sales on raw temperature without removing seasonality first.
- Do not claim forecast weather is reliable beyond the short range; say the adjustment fades.
- State the uncertainty of the estimated effect, not just a point value.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Whether weather matters, how much, and how to use it.

## Is it weather-sensitive
The test and result, with out-of-sample comparison.

## Weather effect
Table: Weather condition | Effect on demand | Range | Applies when.

## Adjusted forecast method
Numbered steps, with the horizon where the adjustment fades.

## Code
Code or formulas, or "Not requested".

## Limits
Bullets.
</output_format>
````

---

<a id="build-driver-based-revenue-forecast"></a>

## Build a driver-based revenue forecast

`build-driver-based-revenue-forecast` · prompt · Forecasting · https://hermes-ide.com/prompts/build-driver-based-revenue-forecast

Forecasts monthly revenue from a driver tree (traffic, conversion, order value, price, volume, customers) so every assumption can be changed, owned and checked against history.

````markdown
<context>
A driver-based forecast replaces "revenue grows 10%" with an identity such as revenue = sessions x conversion rate x average order value, or customers x purchase frequency x basket, or units x price, so each driver can be forecast by the person who owns it and changed in scenarios. Practitioners first check that the tree reproduces historical revenue (returns, discounts, tax and currency often make the identity miss, and the gap needs its own line), then forecast each driver from its own history and plans rather than growing them all by the same rate. They watch for linked drivers: more paid traffic usually lowers conversion, discounts raise conversion but lower order value, so moving one driver alone overstates the effect. Errors multiply through the tree, so a small optimism in each of three drivers becomes a large optimism in revenue; a sensitivity table showing which driver moves revenue most tells management where to focus.
</context>

<task>
Forecast revenue [HORIZON] ahead for this business.

<business>
[BUSINESS]
</business>

<history>
[HISTORY]
</history>

1. Choose the driver tree that fits the business and the data available, down to drivers someone can own and measure. Explain why this tree and not another.
2. Reconcile the tree to history: compute revenue from the drivers for past months and compare with booked revenue; add a reconciling line (returns, discounts, timing) if needed.
3. Forecast each driver separately: its seasonality and trend from history, plus the plans, with the link to other drivers stated (for example lower conversion on extra paid traffic).
4. Multiply through to monthly revenue by line, and show one month's arithmetic in full.
5. Run a sensitivity table: revenue change for a plausible change in each driver (for example traffic plus or minus 10%, conversion plus or minus 0.2 points, order value plus or minus 5%), ranked by impact.
6. Give a low, base and high case built from driver ranges, not a flat percentage on revenue.
7. Describe the spreadsheet or model layout: input cells per driver and month, calculation rows, checks, and an owner per driver.
</task>

<constraints>
- Every driver value must trace to history, a plan given, or a labelled assumption; do not invent benchmarks such as industry conversion rates.
- Do not move linked drivers independently without saying so.
- Show the arithmetic; label hand calculations as approximate.
- Keep the forecast honest about seasonality: use each driver's seasonal pattern, not an average month.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Base revenue for the horizon, the range, and the most sensitive driver.

## Driver tree
The identity and its branches, as an indented list.

## Reconciliation to history
Table: month | revenue from drivers | booked revenue | gap and reason.

## Driver assumptions
Table: driver | recent level | forecast basis | owner role.

## Forecast
Table: month | each driver | revenue, with low and high totals.

## Sensitivity
Table: driver change | revenue impact, ranked.

## Model layout
How to lay it out in a spreadsheet so assumptions are easy to change.
</output_format>
````

---

<a id="forecast-in-excel"></a>

## Build a forecast in Excel or Google Sheets

`forecast-in-excel` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-in-excel

Builds a forecast with spreadsheet formulas (FORECAST.ETS, TREND or seasonal indices), tests it on a held-out stretch against a seasonal naive and adds a range, for people who do not code.

````markdown
<context>
Most business forecasts live in spreadsheets, and most spreadsheet forecasts are a trendline dragged forward with no test and no range. Excel (2016 and later, desktop and web) has exponential smoothing built in: FORECAST.ETS fits the additive error, trend and seasonality (AAA) version of triple exponential smoothing, FORECAST.ETS.CONFINT gives the half-width of a prediction interval, and FORECAST.ETS.SEASONALITY reports the season length it detected. These need a timeline with a constant step; ETS seasonality is additive, so a series whose seasonal swings grow with its level is better forecast on its logarithm and converted back with EXP. Google Sheets has no ETS functions; there the honest options are a seasonal naive (same period last year, times a growth factor), TREND or FORECAST.LINEAR on deseasonalised values with seasonal indices, or GROWTH for steady percentage growth. Whatever the method, the forecast is only credible if it beats a seasonal naive on data it was not fitted to.
</context>

<task>
Build a forecast [HORIZON] ahead in excel.

<data>
[DATA]
</data>

1. Check the data: frequency, number of periods, gaps, duplicates and one-offs. Seasonality needs at least two full cycles (24 months for monthly data with a yearly pattern); with less, say so and use a non-seasonal method.
2. Lay out the sheet: one row per period, dates in column A with a constant step and no blanks, values in column B, a flag column for one-off events, and a separate block for the forecast. Use named ranges or absolute references so formulas can be filled down.
3. Choose the method for excel:
   - Excel: FORECAST.ETS(target_date, values, timeline, seasonality, data_completion, aggregation), with seasonality set to the known period (12 for monthly with a yearly pattern, 7 for daily with a weekly one) or 1 for auto-detect, checked with FORECAST.ETS.SEASONALITY. Mention the Forecast Sheet button (Data tab) as the point-and-click route for desktop Excel.
   - Google Sheets: seasonal indices (average of each period's ratio to its centred moving average, normalised to average 1), a TREND or FORECAST.LINEAR on the deseasonalised series, then multiply back; or seasonal naive times growth for short or noisy data.
   - If seasonal swings grow with the level, work on LN(value) and convert back with EXP.
4. Holdout check: hide the last stretch (one horizon, or at least 6 periods), forecast it using only earlier rows, and compute MAE and the MAE of a seasonal naive (value one season earlier) over the same stretch with formulas. Keep the method only if it wins or ties; otherwise use the seasonal naive.
5. Add a range: in Excel, FORECAST.ETS.CONFINT at 80% and 95%; in Sheets, an empirical band from the holdout errors (for example the 10th and 90th percentile of past errors added to the point forecast), widening with the horizon.
6. Refit on the full history and give the final forecast table.
7. If values were given, compute what you reliably can and label hand-computed figures as approximate; tell the user to trust the sheet's results over yours.
</task>

<constraints>
- Give exact formulas with cell references matching the layout in step 2; do not describe them vaguely.
- Never use a linear trendline on a seasonal series without removing seasonality first.
- Do not invent data or forecast figures you could not compute; show how the sheet will produce them.
- Missing periods must be filled or flagged before using ETS; say which choice FORECAST.ETS's data_completion argument makes (0 treats missing as zero, 1 interpolates).
- If the history is too short for the requested horizon (for example 10 periods to forecast 24 ahead), say the forecast is low confidence or decline the long end.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
The method chosen, why, and what the holdout showed, in two or three sentences.

## Sheet layout
Columns and rows, with what goes where.

## Formulas
Each formula in a code block with the cell it goes in and how to fill it down.

## Holdout check
How the test is set up and the two MAE figures (or the formulas that produce them).

## Range
How the 80% and 95% band is built and how to read it.

## Pitfalls
Bullets: gaps, one-offs, short history, changes the history does not contain.
</output_format>
````

---

<a id="build-prophet-forecast"></a>

## Build a Prophet forecast in Python

`build-prophet-forecast` · prompt · Forecasting · https://hermes-ide.com/prompts/build-prophet-forecast

Writes a Prophet forecast in Python with holidays, changepoint and seasonality tuning, Prophet's own cross-validation and a check against seasonal naive and ETS baselines.

````markdown
<context>
Prophet (the `prophet` package, formerly `fbprophet`) fits a piecewise trend plus Fourier seasonalities plus holiday effects. It is easy to run and handles missing dates and multiple seasonalities, which is why people reach for it, but on many benchmark series it loses to seasonal naive or ETS, and its default prediction intervals tend to be too narrow because they only simulate trend changes and noise, not seasonality or holiday uncertainty. Its common traps: the default `changepoint_prior_scale` of 0.05 can make the trend chase recent noise or miss real breaks; changepoints are only placed in the first 80% of history (`changepoint_range`), so a break in the last months is ignored; additive seasonality is wrong when swings grow with the level (`seasonality_mode="multiplicative"`); weekly seasonality on monthly data is meaningless; `growth="logistic"` needs a `cap` column in both the history and the future frame; extra regressors need known future values; and outliers distort the fit unless set to missing (Prophet tolerates NaN in `y`). The built-in `cross_validation` and `performance_metrics` give a rolling-origin backtest.
</context>

<task>
Build a Prophet forecast [HORIZON] ahead.

<series>
[SERIES]
</series>

1. Describe the series: frequency, length, seasonal periods present, level shifts, outliers. Prophet needs a dataframe with columns `ds` (datetime) and `y`.
2. Decide the setup and say why: which seasonalities to keep (yearly, weekly, daily, or a custom one with `add_seasonality`), additive or multiplicative mode, linear or logistic growth (with a cap and why), holidays via `add_country_holidays` and/or a custom holidays dataframe with `lower_window` and `upper_window` for pre- and post-event effects, and outliers set to NaN with the reason logged.
3. Write the code: load, clean, fit, `make_future_dataframe` with the right `freq`, predict, plot components.
4. Validate with `cross_validation(model, initial=..., period=..., horizon=...)` choosing `initial` of at least one year for yearly seasonality and `horizon` equal to the business horizon; report MAE, MAPE only if values are never near zero, and interval coverage from `performance_metrics`.
5. Run the same rolling-origin windows for a seasonal naive and an ETS model (statsforecast or statsmodels) and compare. If Prophet does not beat them, say so and recommend the simpler model.
6. Tune on the cross-validation score only: a small grid over `changepoint_prior_scale` (for example 0.001 to 0.5) and `seasonality_prior_scale` (0.01 to 10), and `seasonality_mode`. Report the chosen values.
7. Fix the intervals: report backtest coverage of the 80% interval; if it covers well under 80%, widen them (for example with `mcmc_samples` or empirical backtest errors) and say how.
</task>

<constraints>
- Never tune or select on the final test period; tuning uses cross-validation windows only.
- Do not invent accuracy or forecast numbers; if the data is not provided, give the code and say the numbers come from running it.
- Regressors only when their future values are known or planned; otherwise leave them out.
- Do not promise Prophet handles structural breaks automatically; check the last 20% of history for breaks and handle them.
- Keep the code runnable: imports, versions noted as tested assumptions, no placeholder functions.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Two or three sentences: the setup, whether Prophet beat the baselines, and the main risk.

## Setup choices
Bullets: each modelling choice and why.

## Code
One Python code block, end to end.

## Validation
Table: model | MAE | coverage of 80% interval (or its structure with how to fill it).

## Tuning
The grid, the score used, the chosen values.

## Caveats
Bullets: interval width, recent breaks, events not in history.
</output_format>
````

---

<a id="build-ml-forecasting-features"></a>

## Build features for an ML forecasting model

`build-ml-forecasting-features` · prompt · Forecasting · https://hermes-ide.com/prompts/build-ml-forecasting-features

Designs and codes leakage-free features for a gradient-boosting or other ML forecast over many series - lags valid at the horizon, rolling stats, calendar, events, prices - with time-based checks.

````markdown
<context>
Global ML models (gradient boosting such as LightGBM or XGBoost) trained across many series often beat per-series statistical models, and they fail mostly through features rather than algorithms. The classic mistake is leakage: a lag-1 feature looks powerful in training but is not available when forecasting 8 weeks ahead, so either features are built per horizon (direct strategy, lags no shorter than the horizon plus data latency) or the model is applied recursively with its own predictions. Rolling means must be computed on data shifted past the cutoff, target encodings must be fitted on training folds only, and future-known features (calendar, planned prices, planned promotions) are allowed only if they will truly be known at forecast time. Validation must be time-based (rolling origin), never random K-fold, and must be compared with a seasonal naive baseline. Zero-heavy series may need a Tweedie or Poisson objective, and scale differences between series argue for normalising the target or the features per series.
</context>

<task>
<data_description>
[DATA_DESCRIPTION]
</data_description>

<forecast_setup>
[FORECAST_SETUP]
</forecast_setup>

1. Write the leakage rules for this setup: the forecast cutoff, data latency, minimum lag per horizon, and which inputs are known in the future versus only up to the cutoff.
2. Choose the strategy (direct per horizon, recursive, or multi-output) and justify it.
3. Design the features: lags and rolling statistics valid for the horizon, calendar and holiday features, price and promotion features (actual and relative to the item's usual price), series attributes, and hierarchy aggregates. For each, say whether it is known at forecast time.
4. Design the validation: rolling origin folds that mimic production, the metric matched to the business (for example weighted scaled error), and a seasonal naive baseline to beat.
5. Write pandas code that builds the features from a long table with a cutoff argument, so the same function serves training and production, plus a check that fails if any feature uses data after the cutoff.
6. List risks: cold-start series, regime changes, promotions without history, and overfitting to the validation window.
</task>

<constraints>
- No feature may use target values after the cutoff minus the latency; the code must enforce it.
- Never use random K-fold cross-validation for this time series problem.
- Use only the columns described; mark any feature that needs data not described.
- Keep code runnable with pandas and numpy; the model library is optional and named, not required.
- Do not report accuracy figures you did not compute; say the code has not been run unless it has.
</constraints>

<output_format>
## Summary
Strategy, number of features, and how validation works.

## Leakage rules
Bullets.

## Feature list
Table: Feature | Definition | Known at forecast time | Valid for horizons.

## Validation design
Folds, metric, baseline.

## Code
Python code with the feature function and the leakage check.

## Risks
Bullets.
</output_format>
````

---

<a id="build-sales-budget-forecast"></a>

## Build next year's sales budget

`build-sales-budget-forecast` · prompt · Forecasting · https://hermes-ide.com/prompts/build-sales-budget-forecast

Builds next year's monthly sales budget by product or region from history, a bridge of growth assumptions and a seasonal phasing, with a floor, a base and a stretch case.

````markdown
<context>
A sales budget is the number a business plans costs, hiring and cash against, so it must be explainable line by line. Finance teams build it as a bridge from a clean baseline (last twelve months, adjusted for one-offs and lost customers) through separate steps for volume, price (only from the month it takes effect), mix, new products or sites (with ramp-up) and won or lost customers, then phase each line by month using its own seasonal shape and working days. The classic errors: applying a price rise to the full year when it starts in April; growing a baseline that still contains a customer who has left; spreading the annual number evenly across months so every month shows a false variance; and mixing up a budget (a committed plan) with a target (a stretch) and a forecast (the best estimate). A floor and a stretch case alongside the base give management a range to plan costs against.
</context>

<task>
Build the sales budget split by [SPLIT].

<history>
[HISTORY]
</history>

<assumptions>
[ASSUMPTIONS]
</assumptions>

1. Build the baseline: last twelve months (or the latest fiscal year) per line, removing one-offs and revenue from customers or products that will not continue, and show the adjustments.
2. Build the bridge from baseline to budget, one step per assumption: volume growth, price (pro-rated from its effective month), mix, new products or sites with a ramp-up, customers won or lost. Apply steps in a stated order and avoid double counting (a market growth assumption and a rep-by-rep growth assumption are not both added).
3. Phase each line by month from its own seasonal shape (average share of the year per month over two or three years) adjusted for working days and dated events such as a price change or launch.
4. Produce floor, base and stretch: change only the uncertain assumptions, and say which ones and by how much.
5. If there is a top-down target, compare it with the bottom-up base and show the gap and what would have to be true to close it; do not quietly force the numbers to match.
6. Check sense: implied growth versus history, implied units versus capacity, average price trend.
7. List every assumption with an owner role and the evidence behind it.
</task>

<constraints>
- Show arithmetic for each bridge step; label approximations.
- Do not invent market growth rates, customer wins or prices; use those given or mark a placeholder for the user to fill.
- Keep budget, target and forecast distinct in wording.
- If history is shorter than a year or seasonality is unclear, say how phasing was done and the risk.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Base budget total, growth versus last year, floor and stretch, and the main assumptions.

## Baseline
Table: line | last twelve months | adjustments | baseline.

## Bridge to budget
Table: step | amount | basis.

## Monthly phasing
Table: line by month, with totals.

## Floor base and stretch
Table and which assumptions change.

## Assumptions register
Table: assumption | value | owner role | evidence | risk.
</output_format>
````

---

<a id="choose-forecasting-method"></a>

## Choose a forecasting method

`choose-forecasting-method` · prompt · Forecasting · https://hermes-ide.com/prompts/choose-forecasting-method

Chooses the forecasting approach for a problem before any model is built - judgement, simple baseline, statistical, ML or hybrid - from the decision, horizon, data, number of series and team skills.

````markdown
<context>
Teams often pick a forecasting method by fashion (a neural network, a vendor's AI) rather than by the problem. Forecasting practice and large forecasting competitions point to a few robust lessons: simple methods are hard to beat on short or noisy series, combinations of methods tend to be more accurate than a single choice, global ML models trained across many related series win when there are thousands of series with rich drivers, and judgement is the right tool when there is no relevant history but must be structured (analogues, base rates) and tracked. The deciding factors are the decision and its cost of error (which sets the horizon, granularity and whether intervals matter), the data (history length relative to seasonality, intermittency, drivers known in advance), scale (one series or a hundred thousand), and who will maintain it. Every method should be judged against a naive or seasonal naive baseline in a backtest; a complex method that does not beat it is not worth its upkeep.
</context>

<task>
<problem>
[PROBLEM]
</problem>

1. Profile the problem: decision and cost of over- versus under-forecasting, horizon and lead time, level and number of series, history length versus seasonal cycle, intermittency, known future drivers, need for intervals, and team skills and tools.
2. List the information missing that would change the choice, and state assumptions for it.
3. Compare three or four candidate approaches suited to the profile, such as structured judgement, seasonal naive or simple averages, exponential smoothing or ARIMA per series, regression with drivers, global ML across series, or hierarchical reconciliation, covering expected accuracy, explainability, data needs, upkeep effort and failure modes.
4. Recommend one approach (or a combination) and the simplest baseline it must beat, with the backtest design that will decide.
5. Say what evidence would change the recommendation (for example more history, more series, a backtest result).
</task>

<constraints>
- Do not recommend a complex method without naming the baseline it must beat and how that will be tested.
- Be honest about the team's ability to maintain the recommended method.
- Do not quote accuracy figures for the user's problem; accuracy is known only after a backtest.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Recommendation
Approach, baseline to beat, and one-paragraph rationale.

## Problem profile
Table: Factor | Value | Implication.

## Options compared
Table: Approach | Fits because | Risks | Data needs | Upkeep.

## Baseline to beat
Baseline, backtest design and metric.

## What would change the choice
Bullets.
</output_format>
````

---

<a id="clean-demand-history"></a>

## Clean demand history before forecasting

`clean-demand-history` · prompt · Forecasting · https://hermes-ide.com/prompts/clean-demand-history

Prepares sales history for forecasting by separating true demand from stockouts, outliers, one-off orders, data errors and structural breaks, logging every change so the baseline is clean.

````markdown
<context>
Forecasts learn from history, and sales history is not demand. Demand planners know the usual distortions: stockouts cap sales below demand (censored demand), so a model trained on them under-forecasts and the item stays understocked; promotions and one-off bulk orders inflate periods that will not recur; returns netted against sales create negative or low spikes; system migrations, store closures and new channels create level shifts; and data errors (duplicate loads, missing weeks recorded as zero) look like real movement. The aim is not to make the series smooth but to separate the baseline pattern from known, explained effects, and to keep the removed effects for separate modelling (promotions get their own uplift estimates). Every adjustment is logged with a reason so the forecast can be audited, and unexplained outliers are investigated, not deleted.

Tool: python
</context>

<task>
<history>
[HISTORY]
</history>

1. Profile the series: length, frequency, zeros, negatives, gaps, duplicated periods, and obvious level changes.
2. Identify issues and classify each: stockout (sales limited by availability), promotion or price effect, one-off order, returns netting, data error, structural break, or unexplained outlier. Use the context supplied; where context is missing, flag the period as a candidate and say what evidence would confirm it.
3. Decide the treatment per issue: estimate unconstrained demand for stockout periods (for example from comparable periods, other locations or the rate before the stockout ran out), separate promotional uplift into its own column, remove or cap one-off orders, fix data errors at source if possible, and for structural breaks decide whether to use only post-break history or add a level adjustment.
4. Produce the cleaned series alongside the original, with a column for each adjustment so the effects can be added back.
5. Provide code in the chosen tool that applies the cleaning reproducibly from a configuration of flagged periods.
6. Write the change log: period, original, cleaned, reason, method, confidence.
</task>

<constraints>
- Never silently delete or smooth a value; every change appears in the change log.
- Do not treat a stockout zero as zero demand.
- Do not invent context (promotions, stockouts) that the user has not given; mark suspected causes as suspected.
- Keep the original series intact; cleaning produces a new column.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
What was found and how much the cleaning changes total history (in units and percent).

## Issues found
Table: Period | Issue type | Evidence | Confirmed or suspected.

## Cleaning decisions
Bullets per issue type with method and reason.

## Cleaned series
Table or description of original, cleaned and adjustment columns.

## Code
Code or formulas.

## Change log
Table: Period | Original | Cleaned | Reason | Method | Confidence.
</output_format>
````

---

<a id="combine-expert-forecasts"></a>

## Combine several people's forecasts

`combine-expert-forecasts` · prompt · Forecasting · https://hermes-ide.com/prompts/combine-expert-forecasts

Combines estimates or probabilities from several people into one forecast, using the right average, weighting only on real track records, and turning disagreement into cruxes and a next round.

````markdown
<context>
An average of several independent judgments is usually more accurate than most of the individuals in it, because their errors partly cancel. That benefit depends on independence: if people discuss before estimating, or one senior voice anchors the room, the group effectively becomes one forecaster. For quantities, the median resists outliers; a geometric mean suits estimates that differ by multiples. For probabilities, averaging in log-odds is often better than averaging percentages, and when forecasters hold different information, research on forecasting tournaments supports moving the combined probability modestly away from 50%; when they share the same information, it should not be pushed. Weighting by skill helps only when there is a real track record on similar resolved questions; otherwise equal weights are hard to beat. Disagreement is information: the useful output is not just a number but the specific questions (cruxes) on which people differ, and a second independent round after sharing reasoning (a light Delphi) usually narrows the spread for good reasons.

Question: [QUESTION]

</context>

<task>
<estimates>
[ESTIMATES]
</estimates>

1. Check the question: is the resolution clear enough that everyone forecast the same thing? If not, say how the interpretations may differ.
2. Tabulate the estimates, noting whether each was independent, whether any are ranges, and any outliers.
3. Combine: choose the aggregation (median, mean, geometric mean, mean of log-odds), show the calculation, and say whether to extremise and by how much, with the reason. Weight by track record only if one exists on similar resolved questions; otherwise use equal weights and say so. For ranges, combine the low and high ends too and give a combined interval.
4. Disagreement and cruxes: summarise the spread, group the reasoning into the few factual or judgment questions where people differ, and say which crux, if resolved, would move the forecast most.
5. Next round: propose how to run a second independent round (share anonymised reasoning, ask each to re-estimate privately), or which evidence to gather first.
6. Method notes: limits of this combination, and how to record the outcome to build a track record.
</task>

<constraints>
- Do not invent estimates, reasoning or track records that were not given.
- Do not weight people by seniority or confidence of tone.
- If estimates were made after group discussion, say the combination is weaker and why.
- Use roles or initials only; do not ask for or repeat full names.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
The combined forecast, its range or spread, and the main crux.

## Estimates received
Table: person | estimate | independent? | key reasoning.

## Combined forecast
Calculation and result, with method choice explained.

## Disagreement and cruxes
Numbered cruxes with who sits where.

## Next round
Bullets.

## Method notes
Bullets.
</output_format>
````

---

<a id="compare-forecast-models-by-backtest"></a>

## Compare forecast models by backtest

`compare-forecast-models-by-backtest` · prompt · Forecasting · https://hermes-ide.com/prompts/compare-forecast-models-by-backtest

Runs a rolling-origin backtest of candidate forecast models on the user's series and picks one on error, bias, interval coverage and stability across windows, with code.

````markdown
<context>
Picking a forecast model by in-sample fit, or by a single train/test split, routinely picks the wrong one: complex models fit history better and forecast worse, and one test window can be a lucky or unlucky stretch. Practitioners use rolling-origin evaluation (time-series cross-validation): many forecast origins, each forecasting the real decision horizon with only data available at that origin, mirroring how the forecast will be used. They compare against a seasonal naive benchmark (MASE scales errors by it), look at bias as well as error because a consistently high forecast costs differently from a noisy one, check that 80% intervals actually cover about 80%, and look at how much each model's error swings between windows. When the difference between models is within the window-to-window noise, the simpler model or a simple average of the top two (forecast combination often beats any single model) is the safer pick.
</context>

<task>
Compare forecast models for this decision: [DECISION]

<series>
[SERIES]
</series>

1. Design the backtest to match the decision: horizon, refresh cadence (step between origins), the minimum training window, and the number of origins (aim for at least 5 where history allows). State what information is available at each origin; drivers or regressors must use values known at that time.
2. Candidates: always include naive and seasonal naive; add the user's candidates, an ETS model and, where history is long enough, ARIMA. Add a simple combination (mean of the best two).
3. Metrics per model and per window: MAE (or WAPE across series), MASE relative to seasonal naive, bias (mean error and as a percent of actuals), and 80% interval coverage where the model gives intervals. Weight errors at the horizons that matter for the decision.
4. Summarise across windows: mean, spread (standard deviation or range) and the worst window for each model.
5. Choose: the model with the best error and acceptable bias and coverage; if two are within the spread, prefer the simpler or the combination. Say what result would change the choice.
6. If results tables are given instead of data, compute the summary from them and show the arithmetic.
7. Write python code that runs the backtest and produces the results table (Python: statsforecast or sktime cross-validation; R: fable with stretch_tsibble).
</task>

<constraints>
- Never use data after an origin to fit, tune or build features for that origin.
- Do not select or tune on the same windows used to report the final comparison without saying so; if tuning is needed, use earlier windows for tuning.
- Do not declare a winner on a difference smaller than the window-to-window spread.
- Do not invent results; when data is not provided, give the code and the table structure.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
The chosen model, by how much it beat the benchmark, and how confident the choice is.

## Backtest design
Origins, horizon, step, training window, information available at each origin.

## Results
Table: model | mean MAE or WAPE | MASE | bias | 80% coverage | spread across windows | worst window.

## Choice
The pick and the reasoning, plus what would change it.

## Code
One python code block.

## Caveats
Bullets: few windows, structural breaks, events in some windows only.
</output_format>
````

---

<a id="diagnose-forecast-miss"></a>

## Diagnose a forecast miss

`diagnose-forecast-miss` · prompt · Forecasting · https://hermes-ide.com/prompts/diagnose-forecast-miss

Explains why one important forecast missed badly by separating data problems, wrong input assumptions, model error, unforeseen events and plain noise, with a bridge and fixes.

````markdown
<context>
After a big forecast miss, organisations usually do one of two wrong things: blame the model and rebuild it, or blame the market and change nothing. A useful post-mortem separates the error into parts that need different fixes. Data error: the actual was restated, cut off at a different date, or measured on a different definition than the forecast. Assumption error: the inputs were wrong (a promotion slipped, a price rose, a large customer did not order); re-running the model with the actual inputs shows how much this explains. Model error: what remains when the inputs were right. Unforeseen events: things nobody could reasonably have known. Noise: if the actual fell inside the forecast's 80% interval, the miss may be ordinary variation and the right response is no change. Overrides deserve their own line: judgemental adjustments often add bias. Timing errors (demand moved to the next period) are different from lost demand.
</context>

<task>
<miss>
[MISS]
</miss>

<assumptions>
[ASSUMPTIONS]
</assumptions>

<what_happened>
[WHAT_HAPPENED]
</what_happened>

1. Size the miss: absolute and percent, and against the forecast's range if one existed. Check the history of misses for bias (is this one of a run in the same direction?).
2. Check the data first: definitions, cut-off dates, restatements, returns or cancellations treated differently, missing feeds.
3. Build the error bridge from forecast to actual: one bar per cause (each assumption that differed, overrides, one-off events, data adjustments), quantified from the information given, with an unexplained remainder. Show the arithmetic.
4. Classify each part as data, assumption, model, event or noise, and say whether it was knowable at the time the forecast was made.
5. Separate timing from lost volume: will the slipped demand appear in the next period?
6. Recommend fixes proportional to the cause: process fixes for assumptions (who confirms promotion dates), data fixes, model changes only for persistent model error, and no change for noise. Say whether the next period's forecast needs adjusting now.
</task>

<constraints>
- Quantify only from figures given; label estimates (for example an assumed elasticity) and their source.
- Do not assign blame to people; describe process and information gaps.
- If the actual was within the stated interval, say so plainly and do not recommend rebuilding the model on one period.
- Leave an unexplained remainder rather than forcing the bridge to close.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
The size of the miss and the two or three causes that explain most of it.

## Was it really a miss
Comparison with the range and with past bias.

## Error bridge
Table: step | amount | cause type | knowable at the time? Running from forecast to actual.

## Root causes
Bullets, one per material cause.

## Fixes
Table: fix | owner role | addresses | effort.

## Open questions
What data would settle the unexplained part.
</output_format>
````

---

<a id="document-forecast-model"></a>

## Document a forecast model

`document-forecast-model` · prompt · Forecasting · https://hermes-ide.com/prompts/document-forecast-model

Writes the model card for a forecast in use - purpose, data, method, accuracy versus a baseline, weaknesses, override rules, owners and re-validation - so it can be audited and handed over.

````markdown
<context>
Forecasts used for real decisions (stock, staffing, budgets, regulatory capital) need documentation that outlives the person who built them. Model risk practice in banking and good data science practice converge on the same content: the intended use and the uses it is not fit for; data sources, cleaning and known gaps; the method in plain words with enough detail to reproduce; performance measured by backtest at the decision horizon against a simple baseline, including bias and interval coverage; known weaknesses and conditions where it breaks (new products, structural breaks, promotions without history); the override policy (who can override, how overrides are logged and later scored); owners; monitoring; and a re-validation trigger. The commonest gaps are accuracy quoted without a baseline or at the wrong horizon, silent manual adjustments, and no statement of what the model must not be used for.
</context>

<task>
<model_notes>
[MODEL_NOTES]
</model_notes>

1. State the purpose, the decision it supports, the users, and explicitly the uses it is not intended for.
2. Document the data: sources, refresh, history length, cleaning steps and known gaps.
3. Describe the method plainly, then technically (model form, parameters, training window, refit frequency), and how it is run and published.
4. Report performance from the notes: metric, horizon, baseline compared, bias, interval coverage, and the period tested. Where results are missing, say so and list the test needed.
5. List limitations and failure conditions.
6. Write the override and governance section: who may override, logging, scoring of overrides, owners, monitoring, and the triggers and schedule for re-validation.
7. List open items where the notes are incomplete.
</task>

<constraints>
- Use only facts in the notes; write "[not documented]" rather than inventing parameters, results or owners.
- Never report accuracy without its horizon and baseline; if those are missing, mark the result as incomplete.
- Plain language first in each section, technical detail after.
</constraints>

<output_format>
## Purpose and use
Purpose, users, decisions, not intended for.

## Data
Bullets.

## Method
Plain summary, then technical detail.

## Performance
Table: Metric | Horizon | Model | Baseline | Period tested. Then bias and coverage notes.

## Limitations
Bullets.

## Overrides and governance
Bullets: override rules, logging, owners, monitoring, re-validation triggers.

## Open items
Bullets.
</output_format>
````

---

<a id="forecast-marketing-campaign-results"></a>

## Forecast a campaign's results

`forecast-marketing-campaign-results` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-marketing-campaign-results

Forecasts leads, sales and cost per result for a planned campaign budget from funnel rates with diminishing returns and ranges, or works back from a sales target to the budget needed.

````markdown
<context>
Campaign forecasts usually fail in three ways. They assume results scale linearly with budget, when in practice costs per click or impression rise and conversion falls as spend reaches beyond the most responsive audience (diminishing returns). They multiply best-case rates at every funnel step, so small optimism at each step compounds. And they ignore the lag from lead to sale, counting sales inside the campaign window that arrive weeks later. Marketers who forecast well build the funnel step by step (spend to impressions or clicks, clicks to leads, leads to qualified, qualified to sales, sales to revenue), use their own past rates at comparable spend levels, discount rates for a new audience or channel, give a range from the spread of past campaigns, and can run the funnel backwards: from a sales target to the leads, clicks and budget needed.
</context>

<task>
<campaign>
[CAMPAIGN]
</campaign>

<benchmarks>
[BENCHMARKS]
</benchmarks>

1. Lay out the funnel per channel with the rate used at each step and its source (which past campaign, what spend level).
2. Adjust rates for scale and newness: if the budget is well above past spend, raise cost per click or lower conversion and say by how much and why; if the audience or channel is new, widen the range.
3. Forecast per channel and in total: impressions or clicks, leads, qualified leads, sales, revenue, cost per lead, cost per sale, and return on spend. Show the arithmetic for one channel in full.
4. Give low, central and high cases from the spread of past campaigns, varying the few rates that matter most.
5. Time it: when leads arrive and when sales from them will land, given the lead-to-sale lag.
6. If a target was given, or on request, run the funnel backwards to the budget needed, noting that diminishing returns make the required budget grow faster than the target.
7. List what to measure in the first week to re-forecast early.
</task>

<constraints>
- Use rates the user gives; if none exist for a step, say so and mark an explicit placeholder rather than an invented industry benchmark.
- Do not assume linear scaling beyond the spend levels in the history without saying so.
- Never present the forecast as guaranteed results; this is a planning estimate.
- Show arithmetic and label approximations.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Central leads, sales and cost per sale, the range, and the riskiest assumption.

## Funnel
Table: step | rate | source, per channel.

## Forecast
Table: channel | spend | clicks | leads | sales | revenue | cost per lead | cost per sale.

## Range
Low, central and high, and which rates change.

## Working back from the target
Budget, clicks and leads needed for the target, or "not requested".

## What to measure
Bullets for the first week.
</output_format>
````

---

<a id="forecast-project-cost-at-completion"></a>

## Forecast a project's cost at completion

`forecast-project-cost-at-completion` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-project-cost-at-completion

Forecasts what a project will cost and when it will finish from spend and progress to date, using earned value indices, a bottom-up estimate to complete and a range, not the original budget.

````markdown
<context>
Project cost forecasts are routinely too optimistic because they assume the rest of the work will go to plan even though the work so far did not. Earned value management gives a discipline: compare earned value (budgeted cost of work actually done) with actual cost (cost performance index, CPI) and with planned value (schedule performance index, SPI). Research on large project portfolios finds that CPI rarely improves much after a project is a fifth or so complete, so an estimate at completion of budget divided by CPI is a realistic central case, while budget minus remaining-at-plan is an optimistic bound and a CPI times SPI formula is a pessimistic one when schedule pressure drives cost. Progress measurement is the weak point: "percent complete" by spend is circular and makes CPI meaningless, so progress should be measured by physical milestones or completed work packages. A bottom-up estimate to complete from the team should be compared with the index-based ones; a big gap needs an explanation.
</context>

<task>
<project_data>
[PROJECT_DATA]
</project_data>

1. Check how progress is measured; if earned value is derived from spend, say the indices are unreliable and ask for physical progress.
2. Compute cost variance, schedule variance, CPI and SPI, overall and by work package where data allows.
3. Compute estimates at completion: optimistic (actual cost plus remaining budget), CPI-based (budget divided by CPI), and CPI times SPI based; compare with the team's bottom-up estimate if supplied, and with known issues added on top.
4. Compute the to-complete performance index needed to finish within budget and say whether that performance is plausible given the record.
5. Forecast the finish date using SPI or remaining work over recent progress rates, and note the limits of SPI late in a project.
6. Give a recommended estimate at completion with a range, compare it with remaining contingency, and list the questions to put to the team.
</task>

<constraints>
- Compute only from figures supplied and show each formula with numbers.
- Do not present the original budget as the forecast when indices say otherwise.
- Contractual claims, variations and their entitlement are for the commercial or legal owner; include them only as amounts and probabilities supplied.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Recommended estimate at completion, range, finish date forecast, and contingency position.

## Performance to date
Table: Measure | Value | Formula.

## Estimates at completion
Table: Method | EAC | Variance at completion | When it applies.

## Schedule forecast
Forecast finish and method.

## Range and contingency
Low, central, high against remaining contingency.

## Questions for the team
Bullets.
</output_format>
````

---

<a id="forecast-time-series"></a>

## Forecast a time series

`forecast-time-series` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-time-series

Builds an honest baseline forecast (seasonal naive, ETS or similar) with a backtest and prediction intervals, and says when not to trust it. Use for demand, revenue or traffic planning.

````markdown
<context>
You are a forecasting practitioner who follows the habits taught in Hyndman and Athanasopoulos' Forecasting: Principles and Practice. A forecast is only useful with its uncertainty, and a sophisticated model is only worth using if it beats a simple benchmark out of sample. Many business series are short, noisy and disrupted, and the honest answer is often a seasonal naive or exponential smoothing forecast with wide intervals.
</context>

<task>
Forecast this series [HORIZON] ahead.

<series>
[SERIES]
</series>

1. Describe the series: frequency, length, trend, seasonal period(s), level shifts, outliers and missing periods. Check that the history covers at least two full seasonal cycles; if not, say that seasonality cannot be estimated reliably and use a non-seasonal method or an external seasonal profile only if one is given.
2. Prepare: fill or flag missing periods, adjust for known one-off events if they are documented (do not silently delete inconvenient points), and consider a log or Box-Cox transform when variance grows with the level. Adjust for calendar effects (trading days, month length) when they matter.
3. Fit benchmarks and one or two candidates: naive, seasonal naive, drift; then ETS (exponential smoothing with automatic selection) and, if the series is long enough, ARIMA. Add regressors only if their future values are known.
4. Backtest with time-series cross-validation (rolling origin): several forecast origins, each forecasting the full horizon. Report MAE and MASE (relative to seasonal naive) and the coverage of 80% and 95% intervals. Never evaluate on data used to fit.
5. Pick the method that wins the backtest, or the simpler one when the difference is small. Produce the point forecast with 80% and 95% prediction intervals for every period in the horizon.
6. State when not to trust it.
7. Write python code that reproduces everything. Python: statsforecast or statsmodels (ETS, AutoARIMA) with pandas. R: the fable or forecast packages. Spreadsheet: FORECAST.ETS and FORECAST.ETS.CONFINT in Excel, or a seasonal naive with a manual error band in Google Sheets, and say what is lost.
</task>

<constraints>
- If you do not know the frequency and the length of the history, ask for them (and for known events) and stop; the method depends on both.
- If the series values are not provided and cannot be read from the description, provide the code and method choice, and say that the numbers in Backtest and Forecast must come from running it. Never invent forecast numbers.
- If you are given values, compute only what you can compute reliably; label any figure you estimate by hand as approximate and tell the user to confirm by running the code.
- Prediction intervals widen with the horizon; if they do not, something is wrong.
- Forecasts beyond about one seasonal cycle or past a known structural change are flagged as low confidence.
- Do not recommend machine-learning models for a single short series unless the backtest shows they beat the benchmarks.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Two or three sentences: the forecast in round numbers, the interval, the chosen method, and the main risk.

## The series
Bullets from step 1.

## Methods compared
A table: method | MAE | MASE | 80% coverage | 95% coverage (or the structure of this table if not computed).

## Backtest
How the rolling-origin evaluation was set up: origins, horizon, metric.

## Forecast
A table: period | point forecast | 80% interval | 95% interval.

## Code
One code block in python.

## When not to trust it
Bullets: structural breaks, planned changes not in the history, short history, intervals that miss in the backtest, and what to watch to know the forecast is off.
</output_format>
````

---

<a id="forecast-active-users-from-retention"></a>

## Forecast active users from retention

`forecast-active-users-from-retention` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-active-users-from-retention

Forecasts daily or monthly active users by stacking acquisition cohorts on retention curves, and shows how much better retention or more sign-ups would move the total.

````markdown
<context>
Active users are the sum of surviving users from every past sign-up cohort plus the newest cohort: active in period t equals the sum over cohorts c of new users in c times retention at age t minus c. Product analysts build this "layer cake" because a top-line trend hides what drives it: a product can grow MAU with poor retention as long as acquisition keeps rising, and stall the moment acquisition flattens. The shape of the retention curve decides the long run: if it decays to zero, MAU plateaus at roughly new users per period times the sum of the retention curve; if it flattens at a positive level, MAU keeps growing even with flat acquisition. Fitting the tail matters, since young cohorts have only a few observed ages; a power-law or flattening fit extrapolates better than assuming the last observed rate. Definitions matter: retention measured as "active in exactly month k" and "active in month k or later" give different numbers, and reactivated users must be counted once.
</context>

<task>
Forecast active users [HORIZON].

<retention>
[RETENTION]
</retention>

<acquisition>
[ACQUISITION]
</acquisition>

1. Check definitions: what counts as active, whether retention is measured in exactly that period, and whether reactivated users are included. Ask if unclear, since the model must use the same definition as the reported active-user number.
2. Build the retention curve: average by age weighted by cohort size, look at whether recent cohorts retain better or worse, and extrapolate the tail with a flattening or power-law fit. State the assumed long-run floor.
3. Reconstruct the current active total from past cohorts and compare with the reported figure; the gap is reactivation, definition differences or data issues, and needs its own line.
4. Stack planned acquisition on the curve to forecast active users per period. For DAU, use daily or weekly retention, or a DAU-to-MAU ratio from history with its weekday pattern.
5. Show what moves the total: the effect of plus or minus 10% acquisition, of better early retention (for example month-1 retention up 5 points), and of a higher long-run floor, at the end of the horizon.
6. Give low, central and high cases and the arithmetic for one period.
7. Provide a short Python (pandas) or spreadsheet layout for the cohort matrix.
</task>

<constraints>
- Do not invent retention rates or acquisition plans; use the inputs or label assumptions.
- Do not extrapolate a flat retention floor from cohorts that have not been observed long enough; say how uncertain the tail is.
- Keep active-user definitions consistent between history and forecast.
- Show arithmetic and label approximations.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Active users at the end of the horizon, the range, and the biggest lever.

## Retention curve
Table: age | retention | source (observed or fitted).

## Cohort stack
How each cohort contributes in one forecast period, with arithmetic.

## Forecast
Table: period | new users | returning from past cohorts | active total | low | high.

## What moves the total
Table: change | active users at horizon end | difference.

## Code or sheet
A short pandas code block or a spreadsheet layout.
</output_format>
````

---

<a id="forecast-billable-utilisation"></a>

## Forecast billable utilisation and fee income

`forecast-billable-utilisation` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-billable-utilisation

Forecasts billable hours, utilisation and fee income for a consultancy, agency or practice from booked work, weighted pipeline, capacity, leave and holidays, flagging bench and overload weeks.

````markdown
<context>
In professional services, income is people's time sold, so the forecast is a capacity forecast. Firms that forecast well compute available hours properly (contracted hours minus leave, public holidays, training and internal time), not a flat 40 hours a week; they distinguish booked work, which is near certain, from pipeline, which is weighted by probability and often slips in start date; and they look at utilisation by role and week, because a firm can be 75% utilised on average while seniors are overloaded and juniors sit on the bench. Fee income follows billable hours times realised rate, which is often below the rate card because of discounts, write-offs and fixed-price overruns. Project start dates slip far more often than they come forward, so near-term forecasts should assume some delay on pipeline starts. The useful output names the weeks and roles where action is needed while there is still time to sell, hire contractors or move people.

Horizon: [HORIZON]
</context>

<task>
<people_and_capacity>
[PEOPLE_AND_CAPACITY]
</people_and_capacity>

<work>
[WORK]
</work>

1. Compute available hours per person or role per period: contracted hours minus leave, public holidays and non-billable commitments; state any assumption for missing items.
2. Lay booked hours against capacity per period.
3. Add pipeline hours weighted by probability, with a delay assumption on start dates (state it), shown separately from booked work.
4. Compute utilisation per role and period for booked-only and booked-plus-weighted-pipeline, against target.
5. Compute fee income: billable hours times rate, adjusted for realisation if supplied; separate booked and pipeline income.
6. Flag bench periods (utilisation well below target) and overload periods (above about 100% of available hours or above a sustainable level), by role and week.
7. Suggest actions to consider for each flag, with the lead time each needs.
</task>

<constraints>
- Compute only from figures supplied; show the capacity arithmetic for one person or role in full.
- Never add unweighted pipeline to booked work as if certain.
- Do not judge individuals' performance; utilisation is used for planning.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Overall utilisation and fee income for the horizon, booked versus pipeline, and the biggest risk.

## Capacity
Table: Person or role | Contracted | Leave and holidays | Non-billable | Available.

## Forecast utilisation
Table: Role | Period | Available | Booked | Weighted pipeline | Utilisation booked | Utilisation with pipeline | Target.

## Fee income
Table: Period | Booked | Weighted pipeline | Total.

## Bench and overload
Bullets: role, period, gap in hours.

## Actions to consider
Bullets with lead time.
</output_format>
````

---

<a id="forecast-bookings-from-pickup"></a>

## Forecast bookings from pickup pace

`forecast-bookings-from-pickup` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-bookings-from-pickup

Forecasts final bookings for future dates (hotel nights, flights, classes, tours, events) from bookings already on the books and how bookings usually build up, with cancellations and a range.

````markdown
<context>
Revenue managers in hotels, airlines, tour operators and venues forecast from the booking curve, not from last year's total alone. For each future date, the bookings already held are known; what is uncertain is the pickup still to come. Two standard approaches: additive pickup (final equals on-the-books plus the average number of bookings that historically arrive between this many days out and the date) and multiplicative pickup (final equals on-the-books divided by the typical share of final bookings held at this lead time). Additive is steadier when bookings are low; multiplicative tracks pace changes but can explode when early bookings are unusual. Both must account for cancellations and no-shows, which differ by rate type, and both are capped by capacity, so a sold-out date's true demand is unknown (denied demand). Comparing pace with the same lead time last year ("we are 12% ahead of last year at 30 days out") is the most useful early signal, provided like dates are compared (same weekday, same event, not just the same calendar date).
</context>

<task>
<on_the_books>
[ON_THE_BOOKS]
</on_the_books>

<booking_history>
[BOOKING_HISTORY]
</booking_history>

1. Align comparison dates: match each future date to past dates by weekday, season and events, not calendar date alone.
2. For each future date, compute days to arrival and look up the historical pickup from that lead time: average additional bookings (additive) and share of final held (multiplicative). Show both.
3. Net off expected cancellations and no-shows using the supplied rates, and cap at capacity; flag dates likely to sell out.
4. Choose a central forecast per date (or a blend) and give a range from the spread of historical pickup.
5. Compare pace with like dates last year at the same lead time.
6. Identify dates to act on: likely sell-outs (room to raise price or tighten restrictions) and dates well behind pace (promotion or staffing changes), with the lead time left to act.
</task>

<constraints>
- Compute only from figures supplied and show arithmetic for at least one date in full.
- Never let a forecast exceed capacity; report it as sell-out with unconstrained demand unknown.
- Do not invent last year's pace or cancellation rates; if missing, state the assumption and how it changes the result.
- Pricing actions are suggestions for the revenue owner; do not set prices.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Overall pace versus last year, dates likely to sell out, dates behind.

## Method
Additive and multiplicative pickup, cancellations, capacity cap.

## Forecast by date
Table: Date | Days out | On the books | Additive | Multiplicative | Chosen (net of cancellations) | Range | Capacity | Pace vs last year.

## Dates to act on
Bullets: date, signal, possible action, time left.

## Caveats
Bullets.
</output_format>
````

---

<a id="forecast-cloud-spend"></a>

## Forecast cloud spend

`forecast-cloud-spend` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-cloud-spend

Forecasts monthly cloud bills from billing history by service, splitting committed, steady, usage-driven and project spend, with credits, commitments and a budget alert threshold.

````markdown
<context>
Cloud bills are forecast badly when someone extends the total by a growth percentage. FinOps practitioners split the bill: committed spend (reservations, savings plans, committed-use discounts) that is fixed until the term ends; steady baseline (databases, always-on clusters) that moves in steps; usage-driven spend (compute autoscaling, egress, storage growth, requests) that tracks a business driver; and project or one-off spend. They watch for the events that cause the jumps finance remembers: promotional credits expiring, commitments ending and usage reverting to on-demand prices, a migration running old and new environments in parallel, storage that grows every month and is never deleted, and month length (a 31-day month costs about 3% more than a 30-day month at the same daily run rate). They state whether the figures are amortised (commitments spread over the term) or cash (upfront payments when billed), because the two forecasts differ.
</context>

<task>
Forecast cloud spend [HORIZON].

<billing_history>
[BILLING_HISTORY]
</billing_history>

<drivers>
[DRIVERS]
</drivers>

1. Check the history: amortised or cash, currency, credits netted or not, anomalies (a runaway job, a one-off data transfer) to exclude, and whether month length explains swings.
2. Split spend into committed, steady baseline, usage-driven and project or one-off lines, by the services and accounts given.
3. Forecast each line: commitments flat until their end date; baseline flat or stepped for known changes; usage-driven as cost per unit of driver times the driver forecast (check the ratio's trend, since efficiency work or growth discounts move it); storage as cumulative growth; projects from their plans, including parallel running during migrations.
4. Add step changes on their dates: credits expiring, commitments ending or starting, price changes the user knows of, projects starting or ending.
5. Convert daily run rates to months using the days in each month.
6. Give low, central and high cases, varying driver growth and project timing.
7. Set budget alerts: monthly thresholds (for example forecast plus 10%) and a daily run-rate trigger that flags a breach early, with what to check first when it fires.
</task>

<constraints>
- Do not invent provider prices, discount rates or credit amounts; use the billing data and drivers given.
- Keep amortised and cash views separate and say which one the forecast is.
- Do not recommend buying commitments as part of the forecast; note opportunities separately as suggestions.
- Show arithmetic for at least one line and label approximations.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Forecast for the horizon, the range, and the biggest step change.

## Spend breakdown
Table: line | current monthly | type | driver.

## Forecast
Table: month | committed | baseline | usage-driven | projects | credits | total.

## Step changes
Table: date | change | monthly effect.

## Range
Low, central and high and what differs.

## Budget alerts
Thresholds, daily trigger, triage checklist.
</output_format>
````

---

<a id="forecast-contact-volume"></a>

## Forecast contact centre volume by interval

`forecast-contact-volume` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-contact-volume

Forecasts calls, chats or tickets by day and by 15 or 30-minute interval for a contact centre or support team, with weekday shapes, known drivers and a range ready for staffing.

````markdown
<context>
Workforce planners forecast contact volume in two layers: the daily total, which carries trend, seasonality, weekday pattern and events, and the intraday profile, the share of each day's contacts arriving in each interval, which is stable for a given weekday and season and is estimated separately. Splitting them is more accurate than forecasting each interval directly. Common distortions are specific to contact centres: offered contacts differ from handled ones (abandoned calls and callbacks double-count or hide demand), outages and system failures create spikes that will not repeat, and business events (billing runs, letters, price rises, product launches, marketing emails) drive predictable surges that should be modelled as events, not as noise. A Monday after a holiday carries the backlog. Staffing needs depend on interval volume and handle time, so the forecast must reach interval level for schedules, while hiring plans only need weekly or monthly totals.

Horizon: [HORIZON]
Tool: spreadsheet
</context>

<task>
<volume_history>
[VOLUME_HISTORY]
</volume_history>

1. Check the data: offered versus handled versus abandoned, repeat callers and callbacks, missing intervals, outages, and channel shifts (for example contacts moving from phone to chat).
2. Forecast the daily totals for the horizon with a method suited to the history (seasonal baseline with weekday effects, or ETS), plus event adjustments for known drivers in the horizon. Show a backtest against a same-weekday-last-weeks baseline.
3. Build the intraday profile: share of daily volume per interval for each weekday, from recent comparable weeks, smoothed, with separate profiles for unusual day types (post-holiday, billing day).
4. Combine: interval forecast equals daily forecast times interval share. Give a range for the daily total and explain that interval-level noise is larger for small queues.
5. List the drivers and events to confirm with other teams (marketing sends, billing, launches) before finalising.
6. Prepare the hand-off to staffing: interval volumes, the handle-time assumption to be supplied by the staffing owner, and which intervals carry the most risk.
</task>

<constraints>
- Forecast offered demand, not handled contacts, and say how abandoned and repeat contacts were treated.
- Compute only from data supplied; do not invent event effects without past analogues and label assumptions.
- Do not compute staffing numbers unless handle time and service targets are given; hand off instead.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Daily volume forecast for the horizon with range, and the riskiest days.

## Data checks
Bullets.

## Daily forecast
Table: Date | Weekday | Baseline | Event adjustment | Forecast | Low | High.

## Intraday profile
Table: Interval | Share by weekday (or day type).

## Drivers and events
Bullets with source to confirm.

## Code
Code or formulas.

## Hand-off to staffing
Bullets.
</output_format>
````

---

<a id="forecast-cost-inflation-for-budget"></a>

## Forecast cost inflation for a budget

`forecast-cost-inflation-for-budget` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-cost-inflation-for-budget

Projects next year's cost increases line by line - pay, energy, materials, rent, software, contracts - from contract terms, indices the user supplies and timing, with a range for the budget.

````markdown
<context>
Budget holders often apply one headline inflation rate to the whole cost base. Experienced finance teams do not, because cost lines inflate differently and at different times. Pay follows settlements and pay reviews, plus drift from promotions and grade changes, and pay rises take effect on a set date, so only part of the year carries the increase. Contracts may be fixed until renewal, rise by a stated escalator, or be linked to a named index with a lag (often last year's index applied this year). Energy and commodities move with markets and are often partly hedged or fixed. Software subscriptions rise at renewal, frequently by more than general inflation. Rent reviews happen on set dates and may be upward-only. The difference between price inflation and volume change also matters: more staff or more usage is not inflation. A good cost inflation forecast works line by line, separates price from volume, applies increases from their effective dates, and shows a range for the volatile lines.

Budget year: [BUDGET_YEAR]
</context>

<task>
<cost_base>
[COST_BASE]
</cost_base>

1. Classify each line by its price mechanism: fixed until a date, contractual escalator, index-linked (which index, which lag), market-priced, annual review or pay settlement.
2. Separate volume changes from price changes for each line.
3. Apply each price change from its effective date, so the budget-year cost reflects only the months after the change (full-year effect noted for the following year).
4. Use the indices supplied; where none is supplied, state an assumption clearly marked to confirm, rather than quoting a current rate from memory.
5. Give a range for volatile lines (energy, commodities, pay where settlement is not agreed) and the total.
6. Sum to total cost growth split into price and volume, and show which lines drive most of the increase.
</task>

<constraints>
- Never apply one blanket rate to all lines.
- Do not quote current inflation figures, index values or market prices from memory; use supplied figures or labelled assumptions.
- Do not interpret contract wording beyond what is quoted; flag ambiguous clauses for the contract owner.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Total cost growth, split into price and volume, with range and top three drivers.

## Line by line
Table: Line | Current cost | Mechanism | Effective date | Price change | Volume change | Budget-year cost | Full-year effect next year.

## Timing effects
Bullets on part-year effects.

## Range
Table: Line | Low | Central | High.

## Assumptions to confirm
Bullets with owner.
</output_format>
````

---

<a id="forecast-new-product-demand"></a>

## Forecast demand for a new product

`forecast-new-product-demand` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-new-product-demand

Forecasts demand for a product with no sales history by triangulating analogue products, a market funnel and early signals, with a launch curve, a wide range and rules for re-forecasting.

````markdown
<context>
New-product forecasts are mostly wrong, and the job is to be wrong by less and find out fast. Experienced planners triangulate rather than trust one method: analogue forecasting (scale the launch curve of similar past products by differences in price, distribution and marketing), a market funnel (people reachable times awareness times trial times repeat), and early signals (pre-orders and waitlists, which overstate demand because sign-ups cost nothing and need a conversion discount). Trial and repeat behave differently: launch spikes come from trial, the long run depends on repeat. Distribution and supply limit sales before demand does, so a forecast must separate demand from what can be shipped. New products also cannibalise existing ones. Stated purchase intent from surveys overstates real buying, often heavily. The useful output is a range, a launch curve shape, and rules for updating as soon as real sales arrive.

Product: [PRODUCT]
Horizon: [HORIZON]
</context>

<task>
1. List what is known (price, channels, launch date, reach) and the assumptions you must make, each marked as an assumption.
2. Build three independent estimates for the first full period of the horizon:
   a. Analogue: pick the closest analogues, say why each fits or does not, and scale them with stated adjustments.
   b. Funnel: reachable people or outlets times the conversion rates at each stage, with the source of each rate or a clearly labelled assumption.
   c. Signals: convert pre-orders, waitlists or intent into expected purchases with an explicit discount and why.
   If a method has no inputs, say so and do not fake it.
3. Triangulate: compare the estimates, explain why they differ, and give a low, central and high forecast for the whole horizon. The range should be wide; say what it would take to land at each end.
4. Shape the launch curve over the horizon: initial trial spike or slow build, the repeat rate that sets the steady level, seasonality, and the effect of planned marketing bursts. Separate cannibalised sales from net new sales if the product sits next to existing ones.
5. Check supply and distribution: flag any period where planned stock or outlets cap sales below the demand forecast.
6. Set re-forecast rules: which early metrics to read (week 1 to 4 sell-through, repeat rate, rate of sale per outlet), how they map onto the low, central or high path, and when to reorder or cut.
7. List the assumptions to test before launch, most consequential first.
</task>

<constraints>
- Never present a single number without the range. Never use survey intent at face value.
- Do not invent analogue sales figures or market sizes. If none are given, use clearly labelled placeholders and say what data would replace them.
- Keep units consistent (units versus revenue, sell-in to retailers versus sell-through to customers) and say which one each number is.
- Say plainly when the evidence is too thin for anything better than an order-of-magnitude estimate.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
The low, central and high forecast for the horizon, the main driver of the range, and the first metric to watch.

## What we know and assume
Two bullet lists.

## Three estimates
One subsection per method with the arithmetic shown.

## Triangulated forecast
Table: scenario | units or revenue | what has to be true.

## Launch curve
Table by period: low | central | high, plus a sentence on the shape.

## What to watch in the first weeks
Table: metric | low path | central path | high path | action.

## Assumptions to test
Numbered list.
</output_format>
````

---

<a id="forecast-event-attendance"></a>

## Forecast event attendance

`forecast-event-attendance` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-event-attendance

Forecasts how many people will actually turn up to an event from registrations, ticket type and past events, with a range, planning numbers for catering and staff, and signals to update it.

````markdown
<context>
Registrations are not attendance. The gap depends mostly on what people have committed: free events routinely lose a large share of registrants, paid events lose far fewer, and people who were personally invited or have a role (speakers, volunteers, award nominees) almost always come. Registrations also keep arriving until the last days, so a count two weeks out is not the final count; past events give the share of final registrations usually reached by each point. Day of week, start time, weather, travel effort and competing events shift turnout, and reminders the day before reduce no-shows. Organisers plan different things off different numbers: venue safety off the maximum that could arrive, catering off expected attendance with a margin, and staffing off the peak hour. The organiser's own history beats any rule of thumb.

Event: [EVENT]
</context>

<task>
<registrations>
[REGISTRATIONS]
</registrations>

1. List what drives turnout for this event: price or commitment, audience segments, timing, travel, weather, competing events, reminders. Mark each as raising or lowering turnout.
2. Registration forecast: if the count is not final, project final registrations from the share usually reached at this point (from history, or a labelled assumption if no history).
3. Attendance estimate: apply a show-up rate per segment (paid, free, invited roles, plus-ones), from history where available and otherwise from a stated, cautious range labelled as an assumption the organiser should replace with their own data. Give low, expected and high attendance.
4. Planning numbers: venue and safety (plan for the high end and say what happens if more arrive than capacity), catering (expected plus a margin, and how much waste the margin implies), staff and check-in (peak arrivals in the first 30 minutes), materials.
5. Signals to update the forecast: registration pace in the final week, reminder open or confirmation rates, weather forecast, and how each would move the estimate.
6. Assumptions, with the ones that matter most first, and what to record at this event so the next forecast is better.
</task>

<constraints>
- Do not present an industry no-show rate as a fact; any rate not from the organiser's history is a labelled assumption with a range.
- Never plan safety or capacity off the expected number; use the high case.
- Keep segments separate; a blended rate hides the difference between paid and free registrants.
- If the event is very small (under about 20 registrations), say that individual circumstances dominate and a rate-based estimate is rough.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Expected attendance with the range, and the planning number for catering and for capacity.

## What drives turnout here
Table: factor | effect | how strong.

## Registration forecast
Arithmetic and final registrations range.

## Attendance estimate
Table: segment | registrations | show-up rate | low | expected | high | source.

## Planning numbers
Table: decision | number to plan for | why.

## Signals to update
Bullets.

## Assumptions
Bullets, then what to record this time.
</output_format>
````

---

<a id="forecast-from-short-history"></a>

## Forecast from a short history

`forecast-from-short-history` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-from-short-history

Forecasts a series with only a few months of data by borrowing a seasonal shape from analogues or the wider market, estimating the level honestly and giving wide, shrinking ranges.

````markdown
<context>
A new shop, product line or service often has three to eighteen months of data when someone needs next year's numbers. Statistical models cannot separate trend from seasonality with less than two full cycles: a rise from January to April might be growth, spring seasonality or launch ramp-up. Experienced forecasters borrow the seasonal shape from an analogue with longer history (a sister store, the category's sales, the previous owner's figures), divide the short history by those seasonal indices to see the underlying level, estimate the trend cautiously (launch growth rates fade), multiply the indices back in, and give ranges that are honest about how little is known. Compounding an early month-on-month growth rate is the classic error: 30% a month for twelve months is 1.3 to the 12th, about 23 times.
</context>

<task>
Forecast [HORIZON].

<history>
[HISTORY]
</history>

1. Say what this history can and cannot tell: number of periods, whether any full seasonal cycle is covered, launch or ramp-up effects, and one-offs.
2. Choose a seasonal shape: indices from the analogues (normalised to average 1.0), stating why the analogue is comparable and where it is not. If no analogue exists, say so and either assume no seasonality or ask for one; never infer a yearly shape from under a year of data.
3. Deseasonalise: divide each actual by its period's index and show the result. Look at the deseasonalised values for the true level and trend.
4. Estimate the level and trend conservatively: recent level as the base, trend damped toward zero over the horizon, launch growth not compounded forward.
5. Reseasonalise for each future period and give a low, central and high case. Make the range wide (for example plus or minus 25-40% at the far end, wider with fewer data points) and say what drives it.
6. Show the arithmetic for at least two periods.
7. Set the update rule: re-forecast each period as actuals arrive, and say which months will tell the most (the first peak season).
</task>

<constraints>
- Do not fit seasonal statistical models to less than two cycles of data.
- Do not compound early growth rates over the horizon without damping; show what compounding would imply if the user asks for it.
- Do not invent analogue data, industry indices or market statistics; use what is given or ask.
- Label every assumption and its effect on the forecast.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Central forecast, range, and the one assumption that matters most.

## What the history can and cannot tell us
Bullets.

## Seasonal shape
Table: period | index | source.

## Level and trend
Deseasonalised values and the chosen base and trend, with arithmetic.

## Forecast
Table: period | low | central | high.

## How to update it
Bullets: when to re-forecast and what to watch.
</output_format>
````

---

<a id="forecast-fundraising-income"></a>

## Forecast fundraising income

`forecast-fundraising-income` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-fundraising-income

Forecasts a nonprofit's income for the year by stream - regular givers, one-off donors, major gifts, grants pipeline, events, legacies - with retention, probability weighting and a cautious range.

````markdown
<context>
Nonprofit income forecasts go wrong when they are a single total grown by a percentage. Each income stream behaves differently and needs its own logic. Regular giving is the most predictable: this year's income is the retained donors times their average gift plus new recruits, and attrition is front-loaded among new donors. One-off giving depends on appeals and retention of last year's donors, which is often low. Major gifts and grants are lumpy: a pipeline weighted by probability and timing is better than history, but weighting hides the all-or-nothing reality, so the largest few should also be shown as scenarios. Events have costs and should be forecast net. Legacies are volatile and outside the charity's control; many finance teams budget them cautiously, from a multi-year average or notified legacies only. Restricted income must be shown apart from unrestricted because it cannot cover core costs. A board needs a central case, a downside it can survive, and the signposts that show which one is unfolding.

Year: [YEAR]

</context>

<task>
<income_data>
[INCOME_DATA]
</income_data>

1. Split income into streams and, for each, choose the forecast logic: retention times average gift plus recruitment for regular giving; retention and appeal response for one-off giving; probability and timing weighted pipeline for major gifts and grants; net income for events; cautious averages or notified amounts for legacies.
2. Compute each stream for the year, showing the arithmetic and the assumption behind each driver. Separate restricted and unrestricted income where the data allows.
3. Weight the pipeline: amount times probability for each opportunity, assigned to the period of expected receipt; list the largest opportunities individually.
4. Build three scenarios: central, downside (key grants lost, lower retention, legacies at the low end) and upside, and say what each implies for the budget.
5. Name signposts with dates: grant decision dates, appeal results, retention at month X, that will show which scenario is unfolding.
</task>

<constraints>
- Use only figures supplied; label every assumption and show its effect.
- Do not count weighted pipeline as secured income; show secured, probable and possible separately.
- Accounting recognition of income and restricted funds rules vary by country; flag questions for the finance lead or auditor rather than deciding them.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Central forecast, downside, upside, and the share already secured.

## Forecast by stream
Table: Stream | Method | Key assumptions | Restricted | Unrestricted | Total.

## Pipeline weighting
Table: Opportunity | Amount | Probability | Expected | Expected date | Status.

## Scenarios
Table: Scenario | Total | What differs | Budget implication.

## Risks and signposts
Bullets: signpost, date, what it would mean.
</output_format>
````

---

<a id="forecast-headcount"></a>

## Forecast headcount month by month

`forecast-headcount` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-headcount

Forecasts a team's headcount month by month from starting staff, tenure-based attrition, hiring lead times and ramp-up, and shows the hiring plan needed to meet a workload or budget target.

````markdown
<context>
Headcount plans usually go wrong in the same ways: they assume people arrive the day a role is approved, ignore that some people will leave, and treat a new hire as fully productive on day one. In reality the supply of staff is a flow with lags: approval, then time to fill, then notice period, then onboarding and ramp-up, while leavers resign with notice. Attrition is not uniform: people in their first year leave at a higher rate than long-tenured staff, and there are seasonal waves (after bonus payments, at the end of an academic year). Heads, FTE and productive FTE are three different numbers. For small teams one leaver is a large percentage, so the forecast should be read as a range. The demand side matters too: the number of people needed comes from the workload and what one productive person can handle, not from last year's headcount plus a bit.

Horizon: [HORIZON]

</context>

<task>
<workforce>
[WORKFORCE]
</workforce>

1. Starting position: heads, FTE and productive FTE now, open vacancies and their stage, and people currently serving notice.
2. Attrition assumptions: monthly leaver rate from the history, split by first-year and longer-tenured staff where the data allows; seasonal patterns; express each as expected leavers per month. Label assumed rates.
3. Staff needed: translate the workload or cap into required productive FTE per month, showing the arithmetic. If no demand is given, forecast supply only and say so.
4. Month-by-month forecast: opening heads, plus starters, minus leavers, equals closing heads; then productive FTE after ramp-up for recent starters. Apply time to fill and notice periods so hires arrive when they realistically would.
5. Hiring plan implied: how many hires must be approved and when, to close the gap with required FTE, allowing for the lead time and for the extra attrition that new joiners bring. Show the month by which each hire must start recruiting.
6. Risks and scenarios: higher or lower attrition, slower hiring, workload changes; give the gap in productive FTE for each and the most sensitive assumption.
</task>

<constraints>
- Use aggregate figures only; do not request or use names or personal data about individuals.
- Keep heads, FTE and productive FTE separate and named in every table.
- Compute only from figures supplied; label assumptions and show where they would come from.
- Do not recommend dismissals or redundancies; if supply exceeds need, show the gap and note that natural attrition and redeployment are options for the organisation's HR and legal process to consider.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Closing headcount and productive FTE at the horizon, the gap to need, and the date by which hiring must start.

## Starting position
Bullets.

## Attrition assumptions
Table: group | monthly rate | expected leavers per month | source.

## Staff needed
Table: month | workload | required productive FTE.

## Month-by-month forecast
Table: month | opening | starters | leavers | closing heads | productive FTE | required | gap.

## Hiring plan implied
Table: hire | start recruiting by | expected start | productive by.

## Risks and scenarios
Bullets with numbers.
</output_format>
````

---

<a id="forecast-infrastructure-capacity"></a>

## Forecast infrastructure capacity needs

`forecast-infrastructure-capacity` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-infrastructure-capacity

Forecasts when storage, compute, database or network resources will hit their limits from usage history and business growth, with headroom targets, lead times and the date to act.

````markdown
<context>
Capacity planning is a forecasting problem with a deadline: the question is not "how much in a year" but "by when must we start adding capacity so we never cross the safe limit". Practitioners forecast the peak, not the average, because outages happen at peak (the busiest hour, the end-of-month batch); they model growth on the right shape (storage often grows with cumulative data and retention, so it accelerates; traffic often grows with users and has weekly and seasonal peaks); they strip out step changes such as one-off migrations or cleanups before fitting a trend; and they plan to a headroom threshold below the hard limit (for example 70-80% for disk or CPU, because performance degrades and failover needs spare room). The act-by date is the projected date of crossing the headroom threshold minus the lead time to add capacity, using the pessimistic end of the range. Linking resource usage to a business driver (data per customer, requests per active user) makes the forecast respond to business plans instead of extrapolating a line.
</context>

<task>
<usage_history>
[USAGE_HISTORY]
</usage_history>

<lead_time>
[LEAD_TIME]
</lead_time>

1. For each resource, record the hard limit and the headroom threshold (from policy or a proposed default, labelled as a proposal).
2. Prepare the series: use peak values at the relevant granularity, and remove or adjust for step changes.
3. Fit a growth model appropriate to the resource (linear, compound, or driver-based such as usage per customer times forecast customers), compare it with a simple trend, and give a central and pessimistic projection.
4. Compute the date each resource crosses its headroom threshold under the central and pessimistic projection.
5. Compute the act-by date: pessimistic crossing date minus lead time, and flag any act-by date already passed or within the next planning cycle.
6. Provide code (or formulas) to recompute the projections when new data arrives.
</task>

<constraints>
- Compute only from data supplied and show the calculation for each saturation date.
- Plan on peaks and the pessimistic case for act-by dates; say so explicitly.
- Do not invent business growth figures; if none are supplied, use the observed trend and say business plans could change it.
- Recommendations about which capacity option to buy or build are out of scope beyond noting the decision and its deadline.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
The earliest act-by date and the resource that drives it.

## Resources and limits
Table: Resource | Current peak | Hard limit | Headroom threshold.

## Growth model
Per resource: model chosen, fit, and why.

## Saturation dates
Table: Resource | Central crossing | Pessimistic crossing.

## Act-by dates
Table: Resource | Lead time | Act by | Status.

## Code
Code or formulas.

## Caveats
Bullets.
</output_format>
````

---

<a id="forecast-intermittent-demand"></a>

## Forecast intermittent demand

`forecast-intermittent-demand` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-intermittent-demand

Forecasts slow-moving and lumpy items such as spare parts by classifying the demand pattern, using Croston-type or bootstrap methods and turning the result into lead-time demand for stocking.

````markdown
<context>
Items that sell in most periods can be forecast with ordinary methods. Spare parts, slow movers and B2B items often sell nothing most weeks and then a few, or a lot, at once. Ordinary methods fail on them: exponential smoothing chases each spike, percentage errors are undefined when actuals are zero, and a forecast of "0.3 a week" is useless for deciding stock. Practitioners classify each item by the average interval between demands (ADI) and the squared coefficient of variation of non-zero demand sizes (CV²), using the Syntetos-Boylan cut-offs of 1.32 and 0.49 to label it smooth, erratic, intermittent or lumpy. Croston's method forecasts demand size and interval separately; the SBA correction removes its known upward bias; TSB updates the probability of demand every period, so it handles items going obsolete. For stocking, what matters is the distribution of total demand over the lead time, which a bootstrap of past demand can estimate directly. Accuracy is judged on scaled errors and on the service level actually achieved, not MAPE.

Tool: python

</context>

<task>
<history>
[DEMAND_HISTORY]
</history>

1. Check the data: confirm zeros are recorded, flag zeros that might be stock-outs, and note items with too few demand occurrences to estimate anything (fewer than about five non-zero periods).
2. Classify each item by ADI and CV² with the calculation shown, and give its class.
3. Choose a method per class: smooth items can use ordinary methods; intermittent and lumpy items use SBA or TSB (TSB if demand is declining or the item may be phased out); very sparse items use a bootstrap of lead-time demand or a simple rule. Say why.
4. Produce the per-period forecast and, more importantly, the lead-time demand distribution: mean, and the quantile matching the service level.
5. Stocking implication: reorder point or order-up-to level from that quantile, and the stock cost it implies. Flag items where the cost of holding stock outweighs the service level target and a make-to-order or supplier-stock option is worth discussing.
6. Write python code that reproduces the classification, the forecast and a backtest using scaled error (MASE or similar) and achieved fill rate. Python: statsforecast (CrostonSBA, TSB, ADIDA) with pandas. R: tsintermittent or fable extensions. Spreadsheet: ADI and CV² formulas and a simple Croston with SBA factor, saying what is lost.
7. Caveats: obsolescence, changes in installed base, and why the forecast should be reviewed with the people who know upcoming maintenance or projects.
</task>

<constraints>
- Never use MAPE on intermittent series.
- Compute only from the data supplied; label hand calculations as approximate and tell the user to confirm by running the code.
- Do not present a fractional per-period forecast as the answer for stocking; translate it into lead-time demand and a stock level.
- If lead time or service level is missing, show the method with stated example values and ask for the real ones.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Per item: class, method, stocking level, in one table or a few lines.

## Demand pattern
Table: item | non-zero periods | ADI | CV² | class.

## Method choice
Bullets with reasons.

## Forecast and lead-time demand
Table: item | per-period forecast | lead-time demand mean | service-level quantile.

## Stocking implication
Table: item | reorder point | stock value | note.

## Code
One code block in python.

## Caveats
Bullets.
</output_format>
````

---

<a id="forecast-quarter-close-from-pipeline"></a>

## Forecast quarter-end sales from pipeline

`forecast-quarter-close-from-pipeline` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-quarter-close-from-pipeline

Forecasts quarter-end bookings from open pipeline by stage and age using historical in-quarter win rates and cycle times, adds create-and-close deals, and compares the range with the rep call.

````markdown
<context>
Sales leaders cross-check the rep roll-up with a statistical pipeline forecast. The naive version multiplies each deal by its CRM stage probability, but CRM probabilities are rarely calibrated and ignore time: the right rate is the historical share of pipeline in that stage, at this point in the quarter, that closed before quarter end. Deals that are old for their stage, have pushed their close date more than once, or have no recent activity close far less often. Some bookings come from deals not yet in the pipeline (created and closed in the quarter), which a pipeline-only forecast misses. When a few large deals dominate, the expected value hides a lumpy outcome: the honest range comes from simulating each big deal as win or lose rather than from a percentage band.
</context>

<task>
<pipeline>
[PIPELINE]
</pipeline>

<history>
[HISTORY]
</history>

1. Work out the days left in the quarter and, for each stage, whether its typical time to close fits within them.
2. Apply historical in-quarter conversion rates by stage (adjusted for deal age or pushed close dates if the history supports it) to get expected bookings from open pipeline. Show the arithmetic per stage.
3. Add closed-won to date and the expected create-and-close amount for the remaining days, from history.
4. Build the range: treat large deals (for example above 10% of the expected remainder) individually as win or lose with their probability, and the rest as a pooled amount; give a low (about 10th percentile), central and high (about 90th percentile) figure, describing how they were derived.
5. Compare with the rep commit and best case; explain the gap by deal or stage.
6. List the deals that decide the quarter and what evidence would firm each one up.
</task>

<constraints>
- Use historical conversion rates given; if only CRM stage probabilities are available, say they are uncalibrated and treat the result as rough.
- Do not count deals with close dates after quarter end unless history shows such deals often pull in.
- Do not judge individual reps; discuss deals and evidence.
- Show arithmetic and label approximations.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Central forecast, range, and the gap to the call.

## Method
Rates, time left, create-and-close, large-deal handling.

## Expected bookings
Table: source | amount | rate | expected.

## Range
Low, central, high and how each was derived.

## Versus the call
Commit and best case compared with the statistical forecast.

## Deals that decide the quarter
Table: deal | amount | stage | evidence needed.
</output_format>
````

---

<a id="forecast-restaurant-covers"></a>

## Forecast restaurant covers

`forecast-restaurant-covers` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-restaurant-covers

Forecasts covers per service for the coming days or week from bookings, late bookings, walk-ins, no-shows, weather and local events, and turns them into prep and staffing numbers.

````markdown
<context>
Restaurant managers forecast covers to set prep quantities and the rota, and the mistakes are costly both ways: waste and idle staff, or 86'd dishes and long waits. Experienced managers build each service from parts. Bookings on the books, reduced by the no-show rate for that day and booking type (large groups and bookings made weeks ahead no-show more). Late bookings still to come, from how many usually arrive in the last 48 hours for that weekday. Walk-ins, which vary most: by weekday, by weather (rain usually cuts walk-ins and kills terrace trade, heat can lift or cut them depending on the place), and by events nearby. The total is capped by seats times realistic turns. Prep is then covers times each dish's share of orders, plus a buffer that matches how bad running out would be.
</context>

<task>
<bookings>
[BOOKINGS]
</bookings>

1. For each service, forecast: bookings minus expected no-shows, plus expected late bookings, plus expected walk-ins for that weekday, adjusted for weather and events. Show the arithmetic for each service.
2. Cap at capacity (seats times realistic turns for that service) and flag services likely to turn walk-ins away.
3. Give a range per service (low and high) from past variation in walk-ins and no-shows.
4. Turn covers into a prep guide: if dish mix data is given, covers times each dish's share, with a buffer; otherwise list the per-cover quantities the kitchen should fill in.
5. Turn covers into a staffing guide: front-of-house and kitchen staff from covers per staff member the user gives, or ask for their ratio.
6. List what to check on the day (late bookings, weather updates) and when to call in or release staff.
</task>

<constraints>
- If there is no history, use the user's best guesses for walk-ins and no-shows, label them, and keep ranges wide.
- Do not invent weather forecasts or local events; use those given.
- Staffing suggestions must leave legal breaks and contracts to the manager; do not plan rotas that cut required breaks.
- Show arithmetic and label approximations.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Busiest and quietest services and anything to act on now.

## Forecast by service
Table: day | service | booked | expected no-shows | late bookings | walk-ins | forecast | range | capacity.

## Prep guide
Table: dish or item | expected portions | buffer | prep quantity (or the fields to fill).

## Staffing guide
Table: day | service | front of house | kitchen.

## Watch list
Bullets: what to check, when, and what to change.
</output_format>
````

---

<a id="forecast-returns-and-warranty-claims"></a>

## Forecast returns and warranty claims

`forecast-returns-and-warranty-claims` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-returns-and-warranty-claims

Forecasts product returns or warranty claims from past and planned sales using the lag between sale and claim and the claim rate by product and age, so provisions, spares and staff are planned.

````markdown
<context>
Returns and warranty claims are an echo of sales: each month's sales generate claims spread over the following weeks or years. Forecasting claims directly from the claims time series misses this and fails at turning points (a sales peak at Christmas produces a returns peak in January; a warranty spike follows a product's sales by months or years). The standard approach treats each sale month as a cohort: estimate the claim rate per unit sold and the lag distribution (share of a cohort's claims arriving in month 1, 2, 3 after sale and so on), then forecast claims as the sum over cohorts of units sold times rate times lag share. Recent cohorts are immature, so their final claim rate is not yet visible and must be projected from older cohorts' development (the same idea as an insurance claims triangle). Rates differ by product and channel (online returns far exceed in-store), and a product quality issue shows up as a cohort whose early claims run above the usual curve, which is the early warning worth surfacing.

Use: [USE]
</context>

<task>
<sales_and_claims>
[SALES_AND_CLAIMS]
</sales_and_claims>

1. Build the cohort table (sale month by months since sale) from the data. If only claims by month are supplied, say the lag profile must be assumed and state the assumption.
2. Estimate the lag profile (share of eventual claims by month since sale) and the ultimate claim rate per unit sold, using mature cohorts; project immature cohorts forward using the profile.
3. Check for cohorts running above or below the usual curve and flag possible quality or policy changes.
4. Forecast claims by future month: from units already sold (known) plus from future sales (if supplied). Show the two parts separately.
5. Give a range from the variation in rates across cohorts.
6. Translate into the units the use requires (provision value, parts, staff hours) only when the needed conversion figures are supplied; otherwise list them.
7. Provide code or spreadsheet steps to rebuild the triangle monthly.
</task>

<constraints>
- Compute only from data supplied and show the cohort table.
- Do not treat immature cohorts' claims to date as their final rate.
- Accounting treatment of warranty provisions is for the finance owner; this forecast supplies the expected claims, not the accounting entry.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Expected claims for the horizon, split into already-sold and future-sales parts, with range and any cohort warnings.

## Lag profile
Table: Months since sale | Share of claims | Cumulative share.

## Claim rates
Table: Cohort | Units sold | Claims to date | Maturity | Projected ultimate rate.

## Forecast
Table: Month | From units sold | From future sales | Total | Low | High.

## Code
Code or formulas.

## Caveats
Bullets.
</output_format>
````

---

<a id="forecast-new-location-sales"></a>

## Forecast sales for a new location

`forecast-new-location-sales` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-new-location-sales

Forecasts first-year and mature sales for a new store, branch, clinic or restaurant from comparable sites, catchment differences and a ramp-up curve, with cannibalisation and a range.

````markdown
<context>
Retail and hospitality chains forecast new sites with the analogue method: pick existing sites that resemble the new one in format, size, location type and catchment, use their mature sales as the anchor, adjust for known differences, and apply a ramp-up curve, because new sites usually take from several months to two or three years to reach maturity (often with an opening spike from launch marketing followed by a dip). The errors that sink new sites are predictable: picking only the best performers as comparables (and forgetting sites that closed), adjusting the anchor upward for every positive factor and never down, ignoring sales taken from nearby own sites (cannibalisation), and budgeting the mature level from month one. The spread across comparables is the honest range; with few comparables, it should be wide.
</context>

<task>
<new_site>
[NEW_SITE]
</new_site>

<comparables>
[COMPARABLES]
</comparables>

1. Choose comparables: score each existing site on similarity (format, size, location type, catchment, competition, opening season) and keep the closest, including weak and closed sites if they are comparable. Explain exclusions.
2. Anchor: mature annual or monthly sales of the comparables, shown individually, with the median as the central anchor and the spread as the range.
3. Adjust for known differences only where evidence supports a size of effect (for example sales per square metre for a size difference); state each adjustment and keep the total modest.
4. Ramp-up: derive the curve from comparables' sales by month since opening (share of mature level), or state an assumed curve if the data is not there. Apply it from the opening date, with the seasonal pattern of the calendar months it covers.
5. Cannibalisation: estimate the share of the new site's sales that will come from nearby own sites, from past openings if available, and show net new sales to the business.
6. Produce monthly first-year sales and the mature-year figure, with low, central and high from the comparable spread.
7. List the risks and the early signals (first 8-12 weeks) that show whether the site is tracking the curve.
</task>

<constraints>
- Do not invent catchment data, footfall or competitor figures; use what is given or mark placeholders.
- Do not pick only the best-performing comparables; show all considered.
- For a lender or landlord, present the central and low cases honestly; do not inflate.
- Show arithmetic and label approximations.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Mature sales, first-year sales, range, and the main risk.

## Comparable sites
Table: site | similarity notes | first-year sales | mature sales | used or excluded.

## Adjustments
Table: factor | direction | size | evidence.

## Ramp-up
Table: months since opening | share of mature.

## Forecast
Table: month | low | central | high.

## Cannibalisation
Gross sales, share taken from own sites, net new sales.

## Risks and range
Bullets, plus early tracking signals.
</output_format>
````

---

<a id="forecast-school-enrollment"></a>

## Forecast school enrolment

`forecast-school-enrollment` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-school-enrollment

Forecasts pupil numbers by year group for a school or district for the next few years using cohort survival ratios, intake from births or feeder schools, and housing, with a range for planning.

````markdown
<context>
School and district planners use the cohort survival (grade progression) method: each year group moves up a grade next year, and the ratio of pupils in grade g+1 this year to grade g last year captures net moves in and out, repeat years and transfers. Averaging these ratios over three to five years and applying them to today's cohorts projects the existing pupils well for a few years. The hard part is the entry year, which has no previous cohort: it is projected from births in the catchment several years earlier times a capture rate, from feeder school numbers, or from applications, and new housing adds pupils with a lag that depends on the type and size of dwellings. Errors compound with horizon, small schools have volatile ratios, and capacity caps or admission limits mean forecast demand and forecast roll are not the same thing. Planners report a central figure with a range and name the trigger points (for example, if entry applications exceed X by a date, open another class).

Horizon and decision: [HORIZON]
</context>

<task>
<enrolment_history>
[ENROLMENT_HISTORY]
</enrolment_history>

1. Compute grade progression ratios for each transition and each year available, and their average and spread. Flag unusual years (a closure nearby, a boundary change) and decide whether to exclude them.
2. Project existing cohorts forward with the average ratios.
3. Project the entry year from the drivers supplied (births times capture rate, feeder numbers, or applications trend). If no driver is given, use the recent intake trend and say it is the weakest part of the forecast.
4. Add housing-driven pupils if planned housing is given, with the assumptions on yield per dwelling and timing stated as assumptions to confirm locally.
5. Compare forecast demand with capacity and admission limits by year group.
6. Give a range (from the spread of ratios and a low and high intake scenario) and the decision triggers.
</task>

<constraints>
- Compute only from figures supplied and show the ratios table.
- Do not invent birth figures, housing yields or capture rates; any assumption is labelled and its effect shown.
- Separate demand (pupils who would attend) from roll (pupils admitted within capacity).
- For small year groups, warn that ratios are volatile and widen the range.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Total roll and entry-year forecast for each year of the horizon, with the main risk.

## Method
Ratios table: Transition | Year 1 | Year 2 | Year 3 | Average | Spread.

## Forecast by year group
Table: Year group | Now | +1 | +2 | +3 ... | Capacity.

## Range and scenarios
Low, central, high totals with assumptions.

## Decisions and triggers
Bullets: decision, trigger value, date to check.

## Caveats
Bullets.
</output_format>
````

---

<a id="forecast-sell-through-for-markdowns"></a>

## Forecast sell-through and markdown timing

`forecast-sell-through-for-markdowns` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-sell-through-for-markdowns

Projects in-season sell-through for each item to decide when and how deep to mark down so stock clears by the season's end at the best margin, using rate of sale and past markdown uplift.

````markdown
<context>
Merchandisers manage seasonal stock by projecting sell-through (units sold divided by units received) to the end of the season. The current rate of sale times the weeks left gives a first projection, but weekly sales usually fall as the season goes on, so a straight run rate overstates what will sell. Weeks of cover (stock on hand divided by weekly sales) compared with weeks left shows at a glance which items will be stuck. Marking down early and shallow usually earns more than late and deep, because there are more weeks to sell at a modest discount; but marking down a strong seller early gives margin away. Each option is compared on total margin: units sold at full price, units sold at the markdown price, and leftovers at their salvage value. Broken size runs slow an item regardless of price, and some regions regulate reference prices in sales (the "was" price must be genuine).
</context>

<task>
<stock_position>
[STOCK_POSITION]
</stock_position>

1. For each item compute sell-through to date, recent weekly rate of sale, weeks of cover, and weeks left; flag items whose cover far exceeds weeks left and items likely to sell out early.
2. Project end-of-season sales at full price with a declining rate if history shows one (state the decay used), and the projected leftover units.
3. For items at risk, evaluate markdown options (for example 20%, 30%, 50% off now or in two weeks) using the past uplift per depth: projected units sold, leftovers, and total margin including salvage value of leftovers. Show the arithmetic for one item in full.
4. Recommend per item: hold, mark down now (depth), or plan a later step; respect the rules given.
5. Note items limited by broken sizes or poor display rather than price, where a markdown will not help much.
6. Say what to check next week to confirm or change the plan.
</task>

<constraints>
- Do not invent markdown uplifts; if none are given, show results for a few labelled uplift assumptions.
- Compare options on total margin, not on units cleared alone.
- Do not suggest fictitious "was" prices or misleading sale claims; note that reference-price rules vary by country.
- Show arithmetic and label approximations.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Items to mark down now, items to hold, and the margin at stake.

## Where each item stands
Table: item | received | sold | sell-through | weekly rate | stock | weeks of cover | weeks left.

## Projected end-of-season stock
Table: item | projected full-price sales | projected leftover.

## Markdown options
Table: item | option | units sold | leftover | total margin.

## Recommendation
Per item: action, depth, timing, reason.

## Watch next week
Bullets.
</output_format>
````

---

<a id="forecast-subscription-revenue"></a>

## Forecast subscription revenue by cohort

`forecast-subscription-revenue` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-subscription-revenue

Forecasts recurring revenue by sign-up cohort, keeping the existing base separate from new business, with an MRR bridge of new, expansion, contraction and churn and scenarios.

````markdown
<context>
A subscription business has two very different forecasts inside it. Revenue from customers you already have is fairly predictable if you forecast it by cohort: churn is highest in the first months after sign-up and falls as a cohort ages, so applying one average churn rate to the whole base overstates churn for old customers and understates it for new ones. Revenue from customers you have not won yet is the uncertain part and depends on marketing and sales capacity. Annual plans churn in lumps at renewal dates, not smoothly. Price rises lift revenue but cause a churn spike at the next renewal. Logo churn (customers lost) and revenue churn differ when big and small customers behave differently, and expansion can push net revenue retention above 100% even with logo churn. MRR, billings and recognised revenue are different numbers; finance teams need to know which one the forecast is.

Horizon: [HORIZON]

</context>

<task>
<data>
[SUBSCRIPTION_DATA]
</data>

1. Data and definitions: state which revenue measure this is, how churn and expansion are defined, the plan mix, and any gaps. If the data is only totals with no cohort detail, say what cohort data would add and proceed with the best available method, labelled as such.
2. Existing base: estimate retention by cohort age (month 1, 2, 3 and so on) from the history, separately for monthly and annual plans if possible, plus expansion and contraction rates. Project each existing cohort forward and sum them. Place annual renewals in the months they fall due.
3. New business: forecast new subscribers or new MRR from recent trend and the stated plans, then age each new cohort with the same retention curve. Keep this as a separate line.
4. MRR bridge: for each month, opening MRR, plus new, plus expansion, minus contraction, minus churn, equals closing MRR. Show net revenue retention and gross revenue retention for the period.
5. Scenarios: low, central and high, varying new business most and retention less; add the effect of any planned price rise as explicit extra churn at renewal with a stated assumption.
6. Risks and checks: sensitivity of the closing number to a one-point change in early-tenure churn and to new-business volume; sanity checks such as implied customer lifetime and whether the forecast exceeds sales capacity.
</task>

<constraints>
- Never apply a single blended churn rate to all cohorts when cohort data exists; if you must because data is missing, flag it as a known bias.
- Compute only from figures supplied. Label every assumed rate and show where it would come from.
- Keep currency and measure (MRR, ARR, billings, revenue) consistent and named in every table.
- Do not present the central case as a target. If the person gives a target, compare it with the scenarios and say what would have to be true.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Closing MRR or revenue at the horizon for each scenario, the share from the existing base, and the main risk.

## Data and definitions
Bullets.

## Existing base
Table: cohort age | retention | expansion | source; then projected base by month.

## New business
Table: month | new subscribers or MRR | assumption.

## MRR bridge
Table: month | opening | new | expansion | contraction | churn | closing.

## Scenarios
Table: scenario | closing MRR | what differs.

## Risks and checks
Bullets with the sensitivities.
</output_format>
````

---

<a id="forecast-many-series-in-python"></a>

## Forecast thousands of series in Python

`forecast-many-series-in-python` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-many-series-in-python

Builds a pipeline that forecasts thousands of SKU, store or account series with statsforecast or similar, segmented by history and demand pattern, with backtests and fallbacks.

````markdown
<context>
Forecasting many series is a pipeline problem more than a model problem. Experienced practitioners segment before modelling: series with long, smooth history get a statistical model per series (AutoETS, AutoTheta, AutoARIMA, as in Nixtla's statsforecast, which fits them fast in parallel); intermittent series get Croston-type or ADIDA/IMAPA methods (Syntetos-Boylan classification: average inter-demand interval of about 1.32 and squared coefficient of variation of about 0.49 are the usual cut-offs); short series inherit a seasonal profile from their category or fall back to a simple average or naive; brand-new series need a cold-start rule. The silent killers are data issues: in long-format sales tables a missing row usually means zero sales, not missing data, so dates must be completed per series from its first sale; discontinued items must be dropped; and stockouts look like zero demand. Accuracy is judged across the portfolio with volume-weighted measures such as WAPE and against a seasonal naive benchmark, because average MAPE is dominated by tiny series.
</context>

<task>
Design and code a pipeline that forecasts every series [HORIZON] ahead.

<data>
[DATA_DESCRIPTION]
</data>

1. Prepare the data in long format (`unique_id`, `ds`, `y`): complete the date grid per series from its first non-zero date to the last date, fill absent rows with zero only where absence means no sales (ask if unclear), drop or flag discontinued series, and flag known stockout periods rather than treating them as demand.
2. Segment series by history length (shorter than two seasonal cycles, longer) and demand pattern (smooth, erratic, intermittent, lumpy by ADI and CV squared). Report the count and volume share of each segment.
3. Assign models per segment: for example AutoETS and SeasonalNaive for long smooth series, CrostonOptimized or ADIDA for intermittent ones, a category-level seasonal profile or HistoricAverage for short ones, and a rule for new series. Set a `fallback_model` so one failing series does not stop the run.
4. Backtest with `cross_validation` over several windows (`n_windows`, `step_size` equal to the refresh cadence, `h` equal to the horizon). Report WAPE and bias overall and per segment, and accuracy relative to seasonal naive; choose per segment, not per series, unless history is long enough to make per-series selection stable.
5. Produce forecasts with `level=[80, 95]`, clip negatives at zero, and write a tidy output with model used and segment.
6. Write the Python code end to end with statsforecast (or an equivalent library if the user names one), pandas, and parallel fitting; note the expected runtime driver (series count times models times windows).
7. Describe how to run it on a schedule: input checks (row counts, date coverage), drift monitoring per segment, and what to log.
</task>

<constraints>
- Ask how missing rows should be read before filling with zeros if the description does not say.
- Do not report average MAPE across series as the headline; use WAPE or MASE and say why.
- Do not drop poorly forecast series from the evaluation to make the numbers look better.
- Do not invent accuracy or runtime figures; give code that produces them.
- Keep deep-learning or global ML models as an optional next step only if the user's scale and data support it, and only if they beat the statistical backtest.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
The pipeline in three sentences: segments, models, how it is judged.

## Data preparation
Bullets: grid completion, zero handling, stockouts, discontinued items.

## Segmentation
Table: segment | rule | models | fallback.

## Models and fallbacks
Why each model fits its segment; cold-start rule.

## Backtest
Windows, metrics, and the results table structure (segment | WAPE | bias | vs seasonal naive).

## Code
One Python code block.

## Operating it
Bullets: schedule, input checks, monitoring, logging.
</output_format>
````

---

<a id="forecast-website-traffic"></a>

## Forecast website traffic

`forecast-website-traffic` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-website-traffic

Forecasts site sessions or users by channel with seasonality, tracking changes, content and campaign plans and known events, plus a weekly alert band to spot problems early.

````markdown
<context>
Web traffic is a sum of channels that behave differently. Organic search follows seasonality of searches plus slow trends from content and rankings, and shifts suddenly with search-engine updates nobody can predict. Paid traffic follows budget. Email and social follow the send and posting calendar. Direct traffic grows with brand awareness and absorbs tracking gaps. Experienced analysts forecast each channel separately and then add them up. Before forecasting, they check the history for measurement breaks rather than real changes: a switch of analytics tool, a cookie consent banner (which can remove a large share of measured sessions overnight), bot filtering, or changed channel rules. Those are level shifts to adjust, not trends. A useful traffic forecast also produces an alert band so a drop outside normal variation is noticed in days, not at month end.
</context>

<task>
Forecast traffic [HORIZON].

<history>
[HISTORY]
</history>

1. Check the data: measurement breaks (tool changes, consent banners, filters, channel definition changes), spikes from one-off events or bots, and missing periods. Adjust or split the history at breaks and say how.
2. Forecast each channel on its own: organic with yearly and weekly seasonality and its recent trend; paid from planned budget times recent sessions per unit of spend (with diminishing returns noted); email and social from planned volume; direct and referral from trend and seasonality.
3. Add planned effects separately and modestly: new content takes months to rank, so ramp its expected traffic; campaigns have a start and an end; migrations often dip traffic temporarily. State each effect's size and source.
4. Add channels to a total; give ranges per channel and in total, wider for organic beyond a few months because of search-engine changes.
5. Build an alert band for weekly monitoring: the expected value per week with a lower bound (for example the 10th percentile from backtest errors) and what to check when traffic falls below it.
6. Give the method and, if the user wants code, a short Python or spreadsheet approach.
</task>

<constraints>
- Do not invent search volumes, ranking gains or industry growth rates; use the data and plans given or label assumptions.
- Never promise organic traffic growth from content or SEO work; give a range and a lag.
- Treat measurement breaks as adjustments, not as demand changes.
- If history is under a year, say yearly seasonality cannot be estimated and use what is known.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Total forecast, range, the largest channel risk.

## Data checks
Bullets: breaks found and how they were handled.

## Forecast by channel
Table: period | organic | paid | direct | referral | email | social | total.

## Planned effects
Table: change | channel | size | timing | source.

## Total and range
Low, central and high totals.

## Alert band
Weekly expected values and lower bounds, and the triage checklist.
</output_format>
````

---

<a id="forecast-with-leading-indicators"></a>

## Forecast with leading indicators

`forecast-with-leading-indicators` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-with-leading-indicators

Tests whether candidate leading indicators really lead a target series, at what lag and how stably, and keeps them only if they beat a forecast without them out of sample.

````markdown
<context>
Two trending or seasonal series will look correlated whether or not one leads the other, so correlations of raw levels prove nothing. A useful leading indicator moves before the target after trend and seasonality are removed, at a lag that stays stable over time, is available early enough to use (published before the forecast is needed, and not heavily revised later), and has a believable mechanism. The only test that matters in the end is whether a forecast using the indicator beats the same forecast without it out of sample. If the forecast horizon is longer than the lead, the indicator itself must be forecast, and its usefulness drops sharply. Testing many indicators at many lags will find something by chance; fewer, better-motivated candidates beat a data-mining search.

Tool: python
</context>

<task>
<target>
[TARGET_SERIES]
</target>

<indicators>
[CANDIDATE_INDICATORS]
</indicators>

1. For each candidate, record the mechanism, publication delay, revisions and frequency. Drop any candidate that is published after the forecast would be needed, and say so.
2. Make the series comparable: same frequency, aligned dates, and transformed to remove trend and seasonality (differences, growth rates or seasonal differences).
3. Lead tests: cross-correlation of the transformed series at a range of lags, the lag with the strongest relationship, and whether that lag holds in the first and second half of the history. A Granger-type test may be used as a screen only. Correct for the number of candidates and lags tried, or say how many were tried.
4. Out-of-sample comparison: a rolling-origin backtest of a baseline model without indicators (for example ETS or ARIMA) against the same model with the surviving indicators at their lags (ARIMAX or dynamic regression). Compare MASE and interval coverage at the horizon that matters.
5. How to use it: keep only indicators that improve the backtest; state the usable horizon (up to the lead, or longer only with a forecast of the indicator), and how to monitor whether the relationship breaks.
6. Write python code for the alignment, transformation, cross-correlation, and backtest. Python: pandas, statsmodels (ccf, SARIMAX with exog) and a rolling-origin loop. R: fable with ARIMA and xreg, and feasts CCF.
7. Caveats: structural breaks, publication changes, and reverse causation.
</task>

<constraints>
- Never use correlation of untransformed trending levels as evidence of a lead.
- Never include future values of an indicator that would not be known at forecast time (look-ahead leakage); use vintage data if the indicator is revised.
- Compute only from data supplied; if values are not given, provide the method and code and say the numbers must come from running it.
- If no candidate beats the baseline, say so plainly and recommend the baseline.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Which indicators earn a place, at what lag, and how much they improve the forecast.

## Candidate indicators
Table: indicator | mechanism | publication delay | revised? | kept for testing?

## Lead tests
Table: indicator | best lag | correlation after transformation | stable across halves?

## Out-of-sample comparison
Table: model | MASE | 80% coverage | 95% coverage.

## How to use it
Bullets.

## Code
One code block in python.

## Caveats
Bullets.
</output_format>
````

---

<a id="forecast-with-causal-drivers"></a>

## Forecast with planned drivers

`forecast-with-causal-drivers` · prompt · Forecasting · https://hermes-ide.com/prompts/forecast-with-causal-drivers

Forecasts sales or volume from drivers the business plans, such as price, marketing spend or store count, using regression with time-series errors and scenario inputs.

````markdown
<context>
When the business controls the drivers of a series (its own prices, marketing budget, opening hours, store count), a forecast that ignores them cannot answer the questions planners actually ask: what if we raise prices, what if we cut spend. The standard tool is dynamic regression: a regression on the drivers with ARIMA errors (or ETS on the residuals), so seasonality and autocorrelation are not mistaken for driver effects. Experts model price in logs (log units on log price gives an elasticity; a 10% cut at elasticity -1.5 gives 0.9 to the power -1.5, about +17%, not +15%), model media with a carry-over (adstock) and diminishing returns, and use counts like stores as a scaling term. The big traps: drivers set in response to demand (prices cut when sales were weak, spend raised for peak season) bias the estimated effect; a driver that barely varied in history has an unknown effect; and plans outside the historical range are extrapolation.
</context>

<task>
<history>
[HISTORY]
</history>

<plans>
[PLANS]
</plans>

1. Describe the target and each driver: range covered in history, how often it changed, and whether it was set in response to expected demand (seasonal spend, reactive discounts).
2. Specify the model: transforms (logs for price and volume), seasonality, lags or adstock for marketing with the decay chosen by backtest, a saturation curve if spend levels vary widely, and ARIMA or similar errors. Justify every term; drop drivers with no credible variation.
3. Fit and backtest: rolling-origin windows feeding the actual driver values at each origin (so the test isolates model error from assumption error), compared with a model without drivers. Keep a driver only if it improves the backtest.
4. Report effects in business terms with uncertainty: elasticity with interval, return per unit of spend with carry-over, effect per added store.
5. Forecast each scenario in the plans with prediction intervals, and show the difference between scenarios with its own uncertainty.
6. Flag plans outside the historical range and say how much to discount the result.
7. Write python code (Python: statsmodels SARIMAX with exog or statsforecast AutoARIMA with exogenous columns; R: fable ARIMA with xreg).
</task>

<constraints>
- Present estimated effects as associations from observational data unless there was an experiment; say what experiment would confirm them.
- Do not invent elasticities, adstock rates or effects; estimate them from the data or label clearly as assumed inputs.
- Never use a driver in the forecast whose future values are not planned or known.
- If the drivers barely varied, say the effect cannot be estimated and offer an assumption-based scenario instead.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
The base forecast, the scenario differences, and how much to trust them.

## Drivers
Table: driver | historical range | variation | endogeneity risk | kept or dropped.

## Model
The specification in plain words and as a formula.

## Fit and backtest
Accuracy with and without drivers.

## Scenarios
Table: scenario | forecast | interval | difference from base.

## Code
One python code block.

## Caveats
Bullets.
</output_format>
````

---

<a id="forecaster"></a>

## Forecaster

`forecaster` · persona · Forecasting · https://hermes-ide.com/prompts/forecaster

Acts as a seasoned business forecaster who insists on baselines, ranges, backtests and honest track records, and helps people forecast demand, revenue, staffing and uncertain events.

````markdown
From now on, work as this persona: Forecaster.

You are a forecaster. You have spent years building demand, revenue and staffing forecasts in companies and scoring probability forecasts on uncertain events, and you have seen most of the ways forecasts go wrong. You help people forecast better; you do not pretend to know the future.

What you believe:
- A forecast without a range is a guess presented as a fact. Every number you give comes with its uncertainty and what it would take to land at either end.
- Simple methods are hard to beat. A seasonal naive or exponential smoothing forecast is the benchmark; anything fancier has to beat it out of sample.
- Start from base rates, then adjust for the specifics. The inside view (this project, this launch) is almost always too optimistic.
- A forecast is not a target or a plan. Targets say what we want, plans say what we will do, forecasts say what we expect. Mixing them corrupts all three.
- Judgment adds value only when it carries information the data does not have. Small, hopeful tweaks make forecasts worse.
- Track records settle arguments. Keep a log of forecasts and outcomes, and score them.

How you work:
- Ask first what decision the forecast serves, at what horizon and level, and which mistake is costlier: too high or too low.
- Ask for the data: history length and frequency, known events, definitions. One or two questions at a time.
- Show the arithmetic and the method so the person can redo it next month.
- Separate what the data shows from what you assume, and label assumptions.
- Offer the simplest method that answers the question, and say when a specialist method (intermittent demand, hierarchies, leading indicators) is worth the effort.
- End with what to watch and when to re-forecast.

What you flag:
- Forecasts reverse-engineered from a target, hockey sticks with no driver, and growth rates held constant for years.
- Correlations between trending series presented as leading indicators.
- Accuracy measured with MAPE on small or zero values, accuracy without bias, and forecasts judged on a single period.
- Stock-outs, outages and definition changes hiding in the history.
- Ranges that do not widen with the horizon, or that look implausibly narrow.

Your boundaries:
- You never invent data, benchmarks or historical figures. When a number is an assumption you say so and say what would replace it.
- You do not give investment, trading or betting advice. You can explain forecasting methods applied to markets in general, but you do not tell anyone what to buy or sell.
- You do not forecast individuals' personal outcomes from personal data (who will quit, who will default); you work with aggregates.
- When you do not know, you say so once and say what would settle it.

Your voice:
- Calm, precise and plain. No jargon without a one-line explanation.
- Respectfully sceptical: you ask "what would have to be true?" rather than saying "that's wrong".
- Short by default; depth when asked.
````

---

<a id="make-calibrated-forecast"></a>

## Make a calibrated forecast

`make-calibrated-forecast` · prompt · Forecasting · https://hermes-ide.com/prompts/make-calibrated-forecast

Makes a calibrated probability forecast for an uncertain event from a base rate, adjustments for the specifics and a stated confidence, and lists the signposts that would change it.

````markdown
<context>
You forecast the way well-calibrated forecasters do: start from how often things like this usually happen (the outside view), then adjust for what is special about this case (the inside view), and say the number out loud with honest uncertainty. You know the common failures: skipping the base rate and anchoring on a vivid story, rounding everything to 50% or to certainty, adjusting too far on weak evidence, and making a forecast that can never be scored because the question is vague.

Question:
<question>
[QUESTION]
</question>
</context>

<task>
1. Make the question resolvable: restate it so an outsider could decide on the deadline whether it happened, with the exact threshold, date and source of truth. If the question cannot be made resolvable without guessing what the user means, ask before forecasting.
2. Outside view: name one to three reference classes this event belongs to (for example "consumer apps reaching 1,000 paying users within a year of launch", "householder planning applications in this kind of area"). For each, give the base rate and where it comes from. If you are recalling a figure rather than computing it from the user's data, mark it "approximate, from general knowledge" and say how to check it. If no base rate is known, say so and reason from a decomposition (break the event into steps that must all happen and multiply rough probabilities).
3. Pick a starting probability from the outside view and explain the choice in a sentence.
4. Inside view: list the specific factors in this case that push up or down, each with direction and rough size (small, medium, large), and the evidence for it. Adjust in modest steps; strong adjustments need strong evidence.
5. Give the final forecast as a single probability with a plain-language reading ("about 1 in 4"), avoiding 0% and 100% unless the outcome is already settled, and a short note on how confident you are in the forecast itself.
6. Run a quick check from both sides: write the most likely story of how it happens and how it fails. If one story is much easier to write, reconsider the number.
7. List three to five signposts: observable things that would move the forecast, the direction, and roughly to what number.
8. Suggest when to revisit and how to record the forecast so it can be scored later.
</task>

<constraints>
- Never present invented statistics as facts. Label every figure as from the user, computed, or approximate general knowledge.
- Say when your knowledge may be out of date for this question and what recent information would matter most.
- Use numbers, not vague words like "likely". Do not hedge across several numbers; commit to one and show the uncertainty separately.
- For questions about someone's health, a legal case or an investment, give the probability reasoning only, note that a professional's view of the specifics should outweigh a base rate, and do not give advice on what to do.
</constraints>

<output_format>
## The question, made resolvable
One sentence with threshold, date and source of truth.

## Outside view
Table: Reference class | Base rate | Source or label. Then the starting probability.

## Inside view
Table: Factor | Direction | Size | Evidence.

## Forecast
**X%** (plain-language reading), confidence note, then the two stories in two to three sentences each.

## What would change it
Table: Signpost | Direction | New estimate.

## Review
When to revisit and how to record it.
</output_format>
````

---

<a id="make-forecast"></a>

## Make a forecast

`make-forecast` · prompt · Forecasting · https://hermes-ide.com/prompts/make-forecast

Forecasts a number or an event from whatever you have - a history, drivers or only judgement - with a baseline, a low-likely-high range and what to watch. Use for sales, demand or any "what next".

````markdown
<context>
You are a practical forecaster. Most everyday forecasts fail in predictable ways: a straight line through a seasonal series, a single number with no range, a model never compared with the simple guess of "same as last year", or a confident figure for something with no history at all. The right approach depends on what is available: a long history supports statistical baselines, a short one supports simple trend and seasonal reasoning, no history calls for drivers (customers times conversion times price) or comparable cases, and yes-or-no events call for a calibrated probability. Every forecast comes with a range that widens with the horizon.



</context>

<task>
1. Check the essentials: what is being forecast and for what decision, what history or drivers exist, and the horizon. If two or more are missing, ask at most three short numbered questions, each with an example answer (for example "Weekly orders for my online shop, 2 years of data, next 3 months, to plan stock"). Add one line: if they say "just do it", you will assume monthly data forecast 6 months ahead and show the method without numbers until data arrives. Then stop and wait. If you have enough, do not ask; go to step 2.
2. Approach: choose and explain in two or three sentences - a statistical baseline (two or more seasonal cycles of history), simple trend and seasonal reasoning (short history), a driver-based build (no history but known drivers), comparable cases (a new product or event), or a calibrated probability (yes-or-no events).
3. Baseline first: the simple benchmark the forecast must beat - last value, same period last year, or a recent average - with its numbers when data is given.
4. Forecast: the point forecast for each period, adjusted for known events, with the arithmetic shown. For probabilities, start from a base rate of similar cases, then adjust for specifics.
5. Range: a low, likely and high value (roughly an 80% range) from past errors, scenarios or driver ranges, widening with the horizon.
6. How good is it: if there is enough history, hold back the last few periods, forecast them from earlier data and compare the error with the baseline's. Otherwise, say how confident the forecast can be and why.
7. What to watch: the early signals that the forecast is off, when to update it, and what it means for the decision.
8. Go deeper: one line naming two to four next entries that fit, for example "Build a forecast in Excel or Google Sheets", "Forecast a time series", "Build a driver-based revenue forecast" or "Make a calibrated forecast".
</task>

<constraints>
- Never invent data, growth rates or forecast numbers. If no data is given, show the method and a fill-in table, not figures.
- Label anything you compute by hand as approximate and recommend checking it in a spreadsheet or code.
- Never give a point forecast without a range, and never claim more precision than the data supports.
- Do not use a straight-line trend on seasonal data without handling the seasonality.
- If the question cannot be forecast meaningfully (too little history for the horizon, a structural change ahead), say so and give the most useful alternative, such as scenarios.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## What we are forecasting
One or two sentences, including the decision.
## Approach
Two or three sentences.
## Forecast
Table: Period | Low | Likely | High (or Event | Probability | Reasoning). Include the baseline as a row or column.
## Assumptions
Bullets.
## How good is it
The holdout result, or the confidence and why.
## What to watch
Bullets.
## Go deeper
One line.
</output_format>
````

---

<a id="measure-forecast-accuracy"></a>

## Measure forecast accuracy

`measure-forecast-accuracy` · prompt · Forecasting · https://hermes-ide.com/prompts/measure-forecast-accuracy

Measures how good past forecasts were against actuals with the right error metric, bias and forecast value added, and shows where the errors come from and what to change.

````markdown
<context>
You review forecast performance the way a demand planning lead does at a monthly accuracy meeting. Most teams measure accuracy badly. MAPE explodes on small or zero actuals and punishes over-forecasts and under-forecasts unequally, so it ranks items wrongly; WAPE (sum of absolute errors divided by sum of actuals) is better for totals, and MASE (error scaled by a naive forecast's error) lets you compare series of different sizes and tells you whether the forecast beat doing nothing clever. Accuracy alone hides bias: a forecast that is always 8% high can score well and still fill the warehouse. Accuracy must be judged at the lag that matters (an order placed with a 6-week lead time depends on the forecast made 6 weeks out, not last week's) and at the level the decision is made. Actuals during stock-outs understate demand. Forecast value added compares each step (naive, statistical, after manual overrides) to see whether the work done on the forecast improves it; often the overrides make it worse.


</context>

<task>
<data>
[FORECASTS_AND_ACTUALS]
</data>

1. Data checks: confirm what lag each forecast was made at, whether forecasts and actuals use the same units and periods, and flag periods with stock-outs, outages or definition changes that make the actual unreliable. If the lag is unknown, ask for it and say how it changes the reading.
2. Choose metrics for this data and purpose: WAPE for aggregate accuracy, MASE against a naive or seasonal naive benchmark, and MAPE only if no actual is near zero (say why if you drop it). Define each in one line.
3. Compute accuracy overall, by item or segment, and over time, at the decision lag. Show the arithmetic for at least one row so it can be checked.
4. Measure bias: mean error and mean percentage error (signed), and a tracking signal (cumulative error divided by mean absolute deviation) per item; flag items with persistent over- or under-forecasting.
5. Forecast value added: if naive, statistical and final forecasts are given, compare their errors and say which step added or removed accuracy. If they are not given, compute a naive benchmark from the actuals and explain what the team would need to record to measure value added next time.
6. Locate the errors: rank items or segments by their share of total absolute error (a few usually cause most of it), and separate errors from known events, structural changes and noise.
7. Recommend changes: method, process (which overrides to stop), data fixes, and the two or three numbers to track monthly.
</task>

<constraints>
- Compute only from the data given. If values are described but not supplied, give the method and formulas or code to compute them and say the numbers must come from running it; never invent error figures.
- Never compare accuracy across items using MAPE when actuals vary a lot in size; use WAPE or MASE.
- Do not judge a forecast by a single period. Say how many periods the conclusion rests on.
- Treat stock-out periods as censored demand; do not count them as forecast errors without saying so.
- Keep recommendations proportionate to the evidence; a method change needs a backtest, not one bad month.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Three or four sentences: overall accuracy, direction of bias, whether the forecast beats naive, and the top fix.

## Data checks
Bullets.

## Accuracy by metric
Table: level or item | WAPE | MASE | MAPE (if valid) | periods.

## Bias
Table: item | mean error | mean % error | tracking signal | verdict.

## Forecast value added
Table: step | error | change versus previous step.

## Where the errors are
Bullets ranked by share of total error, with cause where known.

## What to change
Numbered actions, then the metrics to track.
</output_format>
````

---

<a id="monitor-forecast-drift"></a>

## Monitor a live forecast for drift

`monitor-forecast-drift` · prompt · Forecasting · https://hermes-ide.com/prompts/monitor-forecast-drift

Sets up ongoing monitoring of a forecast in production with tracking signals, bias and error control limits, and triage rules that say when to adjust, re-fit or escalate rather than react to noise.

````markdown
<context>
A forecast that was good at launch degrades quietly: demand shifts level, a new competitor appears, a data feed changes, or planners start overriding it. Measuring accuracy once a quarter catches this too late. Demand planners use a tracking signal, the running sum of errors divided by the mean absolute deviation, which flags persistent bias: a value beyond about plus or minus 4 to 6 means errors keep falling on one side. Bias matters more than scatter because it compounds into stock or staffing that is systematically wrong. With thousands of series, alerts must be ranked by business impact (volume or value) or planners drown in noise, and each alert needs a triage path: check the data first, then look for a known event, then adjust the level, and re-fit or escalate only when the change is structural. Monitoring should also watch inputs (missing loads, late data) and the share of forecasts manually overridden.
</context>

<task>
<forecast_setup>
[FORECAST_SETUP]
</forecast_setup>

Tool: none

1. Define what to monitor at the decision horizon: bias (mean error and tracking signal), scale-free error (for example scaled or weighted percentage error), interval coverage if intervals are published, input data health, and the override rate.
2. Set alert rules: tracking signal thresholds, error control limits from the historical error distribution, persistence rules, and a minimum impact (volume or value) for an alert to be raised. If history is supplied, compute the thresholds from it and say how many alerts they would have produced.
3. Write the triage playbook: data check, known-event check, level adjustment, re-fit, escalate; who does each and how fast.
4. Rank and route alerts so a planner sees the top few by impact each cycle.
5. Provide code or formulas for the tracking signal and alerts if a tool is chosen.
6. Set a review cadence for the monitoring itself (are alerts being acted on, are thresholds too tight).
</task>

<constraints>
- Compute thresholds only from supplied history; otherwise give provisional values and label them.
- Never recommend re-fitting on every alert; separate noise, events and structural change.
- Keep the number of alerts per cycle manageable and say how the ranking achieves it.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
What will be monitored and the expected alert load.

## What to monitor
Table: Measure | Formula | Horizon | Why.

## Alert rules
Table: Rule | Threshold | Persistence | Minimum impact.

## Triage playbook
Numbered steps with owner and time.

## Code
Code or formulas, or "Not requested".

## Review cadence
Bullets.
</output_format>
````

---

<a id="predict-customer-lifetime-value"></a>

## Predict customer lifetime value

`predict-customer-lifetime-value` · prompt · Forecasting · https://hermes-ide.com/prompts/predict-customer-lifetime-value

Predicts future purchases and value per customer from order history with BG/NBD and Gamma-Gamma models (or a cohort fallback), validated on a time holdout before use.

````markdown
<context>
For non-contractual businesses (shops, marketplaces, restaurants), where a customer's departure is never observed, the standard predictive approach is the "buy till you die" family: BG/NBD (or Pareto/NBD) predicts how many repeat purchases each customer will make from frequency, recency and age (T), and Gamma-Gamma predicts their average order value; together they give expected value over a horizon. Practitioners know the details that make or break it: frequency counts repeat purchases only (the first order is excluded), monetary value is the mean of repeat orders, multiple orders on one day are merged, returns are netted, and Gamma-Gamma assumes order value is independent of purchase frequency, which should be checked by correlation. Value should be on gross margin, not revenue, and discounted. The models must be validated on a time holdout (fit on a calibration period, compare predicted with actual purchases in the next period) before anyone acts on them. Individual predictions are noisy; they rank customers well and sum to good totals, but a single customer's figure is not a promise. For subscriptions or contracts, churn is observed and a survival or retention model fits better. The Python `lifetimes` package is no longer actively maintained; PyMC-Marketing's CLV module is the maintained successor.
</context>

<task>
Predict customer value [HORIZON] for this use: [USE]

<data>
[DATA_DESCRIPTION]
</data>

1. Decide whether the model fits: non-contractual repeat buying, enough repeat customers (a few thousand customers and at least a year of history is a practical minimum), stable business. If contractual or too little data, say so and switch to a cohort or retention-based method.
2. Prepare the data: merge same-day orders, net returns, convert to margin if margin rates are available, exclude test and staff accounts, and build the RFM summary (frequency, recency, T, monetary value) for a calibration period and a holdout period.
3. Fit BG/NBD on the calibration period; check the fit (predicted versus actual repeat-purchase counts, plot of purchases by frequency).
4. Validate on the holdout: predicted versus actual purchases in total and by decile of predicted value; report error and whether the ranking holds.
5. Check the Gamma-Gamma independence assumption (correlation of frequency and monetary value among repeat buyers), fit it on repeat buyers, and combine into discounted value over the horizon.
6. Refit on all data and produce outputs fit for the use: segments or deciles, expected purchases, expected value, probability still active.
7. Write Python code (PyMC-Marketing CLV module, or `lifetimes` if the user already uses it) with pandas, end to end.
</task>

<constraints>
- Do not use this model for subscription or contract churn without saying it does not fit.
- Do not present individual-customer predictions as exact; use them for ranking and totals.
- Do not invent margin rates or discount rates; use those given or label the assumption.
- Do not skip the holdout check; if the user has no time for it, say the results are unvalidated.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
What the model predicts, how it validated, and how it should be used.

## Is this the right model
Fit to the business and data, or the fallback chosen.

## Data preparation
Bullets.

## Models
BG/NBD and Gamma-Gamma setup and checks.

## Validation
Table: decile of predicted value | predicted purchases | actual purchases (or its structure).

## Outputs and use
What fields are produced and how to use them safely for the stated purpose.

## Code
One Python code block.
</output_format>
````

---

<a id="present-forecast-uncertainty"></a>

## Present forecast uncertainty

`present-forecast-uncertainty` · prompt · Forecasting · https://hermes-ide.com/prompts/present-forecast-uncertainty

Turns a forecast with ranges into a chart choice, wording and planning numbers a non-specialist audience will read correctly, tied to the decision and the cost of being wrong in each direction.

````markdown
<context>
Audiences anchor on the first number they see and read a range as either a guarantee or an excuse. Experienced forecasters lead with the decision, not the model: which number to plan for, given that being short and being over cost different amounts. An 80% interval means that about one period in five will land outside it, and saying so in those words prevents "the forecast was wrong" the first time it happens. Natural frequencies ("in about 1 year in 10") are understood better than percentages. Verbal labels like "likely" mean very different things to different people, so pair them with numbers. A fan chart or shaded band shows widening uncertainty better than error bars; a spaghetti of scenarios invites cherry-picking. Showing the past forecast against actuals builds more trust than describing the method.

Audience: [AUDIENCE]

</context>

<task>
<forecast>
[FORECAST]
</forecast>

1. Key message: one or two sentences that state the expected outcome, the range, and what to plan for, in the audience's language.
2. Recommended chart: chart type (band or fan chart, with history), what to show (actuals, central line, 80% and 95% bands or scenarios), labels and annotations, and what to leave out. Say why it suits this audience.
3. Wording: plain sentences for the range using natural frequencies, verbal probability terms paired with numbers, and one sentence that sets expectations about misses.
4. Planning numbers: map the decision to a point in the distribution (for example plan stock at the 80th percentile when running out costs more than waste; plan the budget at the central case with a contingency). Show the reasoning from the stated costs.
5. What not to say: phrasings likely to be misread for this forecast and audience, with better alternatives.
6. Likely questions from the audience, with short honest answers, including "why is the range so wide?" and "how accurate were you last time?".
</task>

<constraints>
- Do not narrow or drop the intervals to make the message simpler; simplify the wording, not the uncertainty.
- Use only numbers in the forecast supplied; if past accuracy is not given, say so rather than claiming a track record.
- If the intervals look implausible (for example they do not widen with the horizon), point that out before presenting them.
- Keep the key message free of jargon such as "confidence interval", "quantile" or "P90" unless the audience uses those terms.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Key message
One or two sentences.

## Recommended chart
Bullets: type, elements, annotations, why.

## Wording
Ready-to-use sentences.

## Planning numbers
Table: decision | number to plan for | why.

## What not to say
Table: avoid | say instead.

## Likely questions
Q and A pairs.
</output_format>
````

---

<a id="project-month-end-from-partial-data"></a>

## Project month-end results from partial data

`project-month-end-from-partial-data` · prompt · Forecasting · https://hermes-ide.com/prompts/project-month-end-from-partial-data

Projects where a month, quarter or season will finish from results to date, using how the period usually fills up rather than a straight run rate, with a range that narrows as days pass.

````markdown
<context>
The straight run rate (total to date divided by days elapsed, times days in the period) is the most common landing estimate and is often badly wrong. Periods do not fill evenly: weekdays and weekends differ and the mix of each changes month to month, paydays and month-end pushes lift the last days (B2B sales often close a large share in the final week), holidays remove days, and some data arrives late, so the latest days are understated. A better method uses history: by this day of past periods, what share of the final total had typically arrived? Dividing the total to date by that share gives a projection, and the spread of shares across past periods gives an honest range, wide early in the period and narrowing as it closes. Known items still to come (booked orders, scheduled invoices) can be added on top.


</context>

<task>
<to_date>
[PERIOD_TO_DATE]
</to_date>

1. Check the data: days elapsed, working or trading days elapsed and remaining, holidays, and whether recent days may be incomplete because of reporting lag.
2. Methods compared:
   a. Straight run rate by calendar days.
   b. Run rate by trading days or weighted by day of week.
   c. Share-of-period from history: the typical share of the final total reached by this day, and the projection it implies.
   d. If known future items are listed, add them to the to-date figure and project only the unknown part.
   Show the arithmetic for each and explain why they differ.
3. Projection: pick the most suitable method and say why; give the central projection.
4. Range: from the spread of shares in past periods (or a stated assumption if no history), give a low and high landing; if a target is given, estimate the chance of reaching it and what daily average the remaining days would need.
5. What would change it: late-period effects, a big deal or order outstanding, data lag, and the date when the projection becomes reliable.
</task>

<constraints>
- Compute only from figures supplied; show every calculation.
- If no history is given, say the range is an assumption and how many past periods would make it reliable.
- Do not report a projection to more precision than the data supports; round sensibly.
- Never present the run rate alone when the history shows the period fills unevenly.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Central projection, range, and the chance of hitting target if one was given.

## Methods compared
Table: method | projection | arithmetic | why it differs.

## Projection
Two or three sentences.

## Range
Low and high with how they were derived; required daily average to hit target.

## What would change it
Bullets.

## Notes
Data checks and assumptions.
</output_format>
````

---

<a id="project-service-demand-from-demographics"></a>

## Project service demand from demographics

`project-service-demand-from-demographics` · prompt · Forecasting · https://hermes-ide.com/prompts/project-service-demand-from-demographics

Projects future demand for a public or community service (care places, clinic visits, library use, social housing) from population projections by age times usage rates, with scenarios.

````markdown
<context>
Public service planners project demand with a simple, auditable method: current usage rate per head by age band, times projected population in each band, summed. Its power is that ageing shows up correctly: a stable total population can hide a fast-growing over-85 group whose care use is many times that of the 65-74 group, so projecting on total population badly understates demand. Its weaknesses are also known. Usage rates are not fixed: they move with healthier ageing, policy (eligibility thresholds, a shift from residential care to home care), supply (use reflects what is available, so unmet need is invisible), and prices. Population projections are themselves trend-based, not forecasts, and are least reliable for small areas and long horizons. Good practice therefore presents a constant-rate baseline plus scenarios for rate change, says where current use understates need, and shows which age band drives the growth.

Purpose: [PURPOSE]
</context>

<task>
<population>
[POPULATION]
</population>

<usage>
[USAGE]
</usage>

1. Compute current usage rates by age band (users or units per 1,000 population), checking that population and usage cover the same area, period and bands.
2. Project demand at constant rates for each projection year, by age band and total; show which bands drive the change.
3. Build scenarios: rates falling (for example healthier ageing or prevention), rates rising (for example tighter informal care), and a policy or supply change named in the inputs; state each scenario's assumption as a labelled assumption.
4. Note where current use understates need (waiting lists, unmet demand, supply limits) and what data would show it.
5. Show sensitivities: the effect of a stated change in the rate of the most important band, and of the population projection's uncertainty if a range is supplied.
6. Translate demand into the planning unit asked for (places, sessions, staff) only where conversion figures are supplied.
</task>

<constraints>
- Compute only from figures supplied and show the rate table and one band's projection in full.
- Do not invent population projections or usage rates; label every assumed rate change.
- Present results as projections under stated assumptions, not predictions.
- Flag small-area or small-number results as unreliable.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Demand now and at the horizon under constant rates, the scenario range, and the age band that drives it.

## Usage rates
Table: Age band | Population now | Users now | Rate per 1,000.

## Projection
Table: Age band | Rate | Population year X | Demand year X ... | Change.

## Scenarios
Table: Scenario | Assumption | Demand at horizon | Change vs now.

## Sensitivities
Bullets.

## Caveats
Bullets.
</output_format>
````

---

<a id="project-growth-to-milestone"></a>

## Project when a metric hits a target

`project-growth-to-milestone` · prompt · Forecasting · https://hermes-ide.com/prompts/project-growth-to-milestone

Estimates when a growing metric (users, revenue, subscribers, followers) will reach a target by comparing linear, exponential and S-curve fits, and gives a date range, not one date.

````markdown
<context>
"When will we hit 50,000?" depends almost entirely on the growth shape assumed. Linear growth adds a steady amount per period: time = (target - current) / average addition. Exponential growth multiplies by a steady rate: time = ln(target / current) / ln(1 + rate). An S-curve (logistic) grows fast and then slows as it approaches a ceiling such as market size. Early-stage metrics often look exponential but are usually linear in absolute additions once paid or launch effects fade, and every real metric eventually bends toward a ceiling. The quick test experts use: if the absolute additions per period are roughly constant, growth is linear; if the percentage growth is roughly constant, it is exponential; if the percentage is falling steadily, an S-curve or damped growth fits better. The answer is a range across plausible shapes, plus the early signals that tell which one is happening.
</context>

<task>
Estimate when the metric reaches [TARGET].

<history>
[HISTORY]
</history>

1. Tabulate the history with absolute additions and percentage growth per period. Note one-offs (a viral spike, a bulk import) and whether the recent trend differs from the early one.
2. Project three ways and show the arithmetic:
   - Linear: average recent addition, time to target.
   - Exponential: average compound rate (from first to last value, (last / first)^(1/periods) - 1), time = ln(target / current) / ln(1 + rate).
   - S-curve: if a ceiling is given or implied, a logistic fit or a damped-growth projection; if none is known, say what ceiling would make the target unreachable.
3. Judge plausibility with the additions-versus-percentages test from the context and any known changes ahead.
4. Give a date range: the most plausible projection as the central date, with early and late dates from the other shapes or from the spread of past growth rates.
5. If the target must be hit by a fixed date, compute the growth needed (per period, linear and compound) and compare it with what has been achieved.
6. List leading signals that would move the date earlier or later.
</task>

<constraints>
- Show formulas and numbers; label hand calculations as approximate.
- Never give a single exact date as a promise; give a range and the shape assumption behind each end.
- With fewer than four data points, say the shape cannot be told apart and give only a wide range.
- Do not invent a market size or ceiling; use one given or show the result for a few clearly labelled values.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
The central date and the range in one or two sentences.

## Growth so far
Table: period | value | addition | percent growth.

## Three projections
Table: shape | rate used | periods to target | date.

## Which is most plausible
Reasoning from the data.

## Date range
Early, central and late dates with their assumptions; growth needed if there is a deadline.

## Signals to watch
Bullets.
</output_format>
````

---

<a id="reconcile-top-down-and-bottom-up-forecasts"></a>

## Reconcile top-down and bottom-up forecasts

`reconcile-top-down-and-bottom-up-forecasts` · prompt · Forecasting · https://hermes-ide.com/prompts/reconcile-top-down-and-bottom-up-forecasts

Reconciles forecasts made at different levels (total versus regions, products or reps) so they add up, explains where the gap comes from, and picks a reconciliation method with code.

````markdown
<context>
Forecasts made at different levels rarely add up. Totals are smoother and easier to forecast; low-level series are noisy but carry local knowledge. When the bottom-up sum and the top-down total disagree, the gap is usually a difference in assumptions (sales teams sandbag or inflate, finance applies a growth target, a statistical model misses a new store), not arithmetic, and reconciling it blindly hides the argument the business needs to have. The mechanical options are bottom-up (sum the lowest level), top-down (split the total by historical or forecast proportions, which breaks when the mix is changing), middle-out, and optimal reconciliation such as MinT, which combines forecasts from all levels using their error covariance and usually beats any single level. After reconciliation, integer quantities and non-negative values may need fixing.

Tool: python

</context>

<task>
<forecasts>
[FORECASTS]
</forecasts>

1. Line the forecasts up by level and period in the same units; state the gap between the top-down total and the bottom-up sum, in absolute and percentage terms, per period.
2. Explain where the gap comes from: break it down by child series (which regions or products account for most of it) and by likely cause (different growth assumptions, a missing new item, a target embedded in the total, timing differences, definitions). Separate what the numbers show from what you infer.
3. Choose a reconciliation method and say why: bottom-up when low-level forecasts are good and the mix is shifting, top-down when low-level series are too noisy, middle-out when one level is most reliable, MinT or similar when history allows. If the gap is a business disagreement, say the method cannot settle it and list the decision needed.
4. Produce the reconciled forecast at every level, adding up exactly, and show how much each series moved from its original forecast.
5. Write python code. Python: hierarchicalforecast (with statsforecast) for BottomUp, TopDown and MinTrace. R: fable with aggregate_key and reconcile(). Spreadsheet: proportional allocation formulas with a check row, saying what is lost.
6. Open decisions: the assumptions owners must agree on, and how to measure which level was more accurate after the fact.
</task>

<constraints>
- Compute only from the figures supplied; label any hand calculation as approximate.
- Never silently force the bottom-up numbers to a target total; if the total is a target, say so and show the forecast and the target separately.
- Flag negative or fractional allocations and say how they are handled.
- Keep units and periods identical across levels before comparing.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
The gap, its main cause, the method chosen and the reconciled total.

## The gap
Table: period | top-down | bottom-up sum | gap | gap %.

## Where it comes from
Table: child series | share of gap | likely cause | evidence or inference.

## Reconciliation method
Bullets with the reason.

## Reconciled forecast
Table by level and period, with original versus reconciled.

## Code
One code block in python.

## Open decisions
Numbered.
</output_format>
````

---

<a id="review-forecast-assumptions"></a>

## Review a forecast's assumptions

`review-forecast-assumptions` · prompt · Forecasting · https://hermes-ide.com/prompts/review-forecast-assumptions

Reviews someone else's forecast or projection by surfacing its hidden assumptions, testing them against base rates and capacity limits, and finding the few that drive the result.

````markdown
<context>
You review forecasts the way an experienced finance partner or investor does: not by re-forecasting, but by finding what has to be true for the numbers to happen and asking whether it is plausible. Most bad forecasts fail on a few assumptions that are hidden in the arithmetic: a conversion rate held constant while marketing spend triples, growth that stays flat-out for five years when few companies sustain it, prices rising with no effect on volume, a sales team that sells from day one, costs that do not grow with volume, seasonality missing, or a single number with no range. Forecasts made to support a decision are pulled toward the answer the author wants. A good review states the implied assumptions in plain numbers, compares them with base rates and physical limits, and finds the two or three assumptions that move the result most, so the conversation focuses there.


</context>

<task>
<forecast>
[FORECAST]
</forecast>

1. Extract the assumptions, stated and implied, and express each as a plain number (for example "revenue grows 15% a month for 24 months", "each salesperson closes 8 deals a month from month one"). Flag assumptions that are implied by the arithmetic but never stated.
2. Reality checks for each: compare with the history in the forecast itself, with base rates for similar businesses or projects where you can name the kind of evidence (not invented statistics), and with capacity limits (staff, stock, market size, cash). Check internal consistency: units, timing, whether costs scale with volume, whether the drivers multiply to the totals.
3. Find what drives the result: vary the most uncertain assumptions within a plausible range and show the effect on the headline number; rank them.
4. Note what is missing: ranges, downside case, seasonality, ramp-up, churn, working capital, one-off events.
5. Write questions for the author, specific and answerable, most important first.
6. Suggest changes: revised assumptions to test, a range instead of a point, or a scenario to add. Do not rebuild the whole forecast unless asked.
</task>

<constraints>
- Do not invent benchmark figures; describe the kind of base rate to check and where it would come from, or use only figures the user gives.
- Criticise the assumptions, not the person. Acknowledge what is solid.
- Keep the arithmetic visible; any recalculated number must show its inputs.
- If the forecast is too vague to review (no numbers or logic), say what is needed and stop.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Verdict
Two or three sentences: how credible the headline is and the single biggest concern.

## Assumptions found
Table: assumption | stated or implied | value | concern level.

## Reality checks
Bullets per assumption that fails a check.

## What drives the result
Table: assumption | plausible range | effect on headline | rank.

## Questions for the author
Numbered.

## Suggested changes
Bullets.
</output_format>
````

---

<a id="forecast-cycle-track"></a>

## Run a monthly forecast cycle

`forecast-cycle-track` · workflow · Forecasting · https://hermes-ide.com/prompts/forecast-cycle-track

Runs one monthly or quarterly forecast cycle from data checks and last cycle's accuracy, through a statistical baseline and logged adjustments, to an agreed forecast published with its uncertainty.

````markdown
Runs one forecast cycle the way a disciplined demand or finance planning team does: check the data and learn from last cycle's errors, build a statistical baseline, add only evidence-based adjustments with a log, agree one number across functions without hiding disagreements, and publish it with its uncertainty and what to watch. Each step writes one artifact and stops for approval; later steps reuse approved figures.

Scope:
[SCOPE]

<data>
[DATA]
</data>

Rules for every step:
- Compute only from the data supplied or confirmed. Never invent actuals, accuracy figures or uplifts; when a number is an assumption, label it and say what would replace it.
- Keep the forecast, the target and the plan separate. If a target is involved, show the gap; do not bend the forecast to meet it.
- Every forecast figure carries a range.
- Keep the baseline, each adjustment and the final number as separate columns so the cycle can be audited.
- Keep a running list of open questions and owners, carried into step 5.

---

# Step 1: Data and last cycle

1. Load the new actuals and check them: missing periods, late data, stock-outs or outages that censor demand, definition or hierarchy changes, one-off events.
2. Score last cycle: compare the forecast made at the decision lag with the actuals using WAPE and bias (signed error), by item group. If statistical and final versions exist, compute forecast value added for the overrides.
3. Note what last cycle got wrong and why (event, process, data, noise), and the lessons to apply this cycle.

Sections: Data checks, Last cycle accuracy, Bias, Value added by adjustments, Lessons, Open questions. Stop for approval.

---

# Step 2: Statistical baseline

1. Fit simple benchmarks (naive, seasonal naive) and one or two candidates (exponential smoothing, ARIMA, or Croston-type methods for intermittent items) on the approved history.
2. Pick per series or group by a rolling-origin backtest at the horizon that matters; prefer the simpler method when the difference is small.
3. Produce the baseline with 80% and 95% intervals by period, and the total at the level decisions are made.
4. Flag series where the baseline is unreliable (short history, structural breaks) for extra attention in step 3.

Sections: Methods and backtest, Baseline forecast, Unreliable series, Open questions. Stop for approval.

---

# Step 3: Adjustments

1. List the known events and inputs from stakeholders: promotions, price changes, launches, lost or won customers, capacity limits, moving holidays.
2. For each, check whether the baseline already captures it; adjust only for what is new, sized from past analogues, including dips before and after promotions and cannibalisation.
3. Push back on adjustments with no evidence or within normal error, and on any adjustment that is really a target.
4. Write the adjustment log: event, periods, size, evidence, owner.

Sections: Inputs received, Already in baseline?, Adjustments applied, Adjustments declined and why, Adjusted forecast, Adjustment log. Stop for approval.

---

# Step 4: Agree the number

1. Line up the adjusted forecast with other views (finance top-down, sales bottom-up, the target) at the same level and units; show each gap.
2. Explain the gaps by cause, reconcile the levels so they add up, and list the disagreements that remain as explicit decisions with owners.
3. Translate the agreed forecast into planning numbers for the decisions it feeds (for example a higher percentile for stock or capacity when shortages cost more).

Sections: Views compared, Gaps and causes, Reconciled forecast, Decisions needed, Planning numbers. Stop for approval.

---

# Step 5: Publish

1. Write the forecast summary for the users: the agreed forecast with its range, the change from last cycle and why (a bridge), the main risks and opportunities with rough sizes, and the decisions needed.
2. Recommend the chart (actuals plus a band showing the range) and plain wording for the uncertainty, such as "about 1 month in 5 will fall outside this range".
3. List what to watch before the next cycle and the triggers for an early re-forecast.
4. Carry forward open questions, owners and the adjustment log for scoring next cycle.

Sections: Forecast summary, Change from last cycle, Risks and opportunities, Chart and wording, What to watch, Carried forward.
````

---

<a id="score-probability-forecasts"></a>

## Score probability forecasts

`score-probability-forecasts` · prompt · Forecasting · https://hermes-ide.com/prompts/score-probability-forecasts

Scores a log of resolved probability forecasts with Brier and log scores, a calibration table and benchmarks, and finds patterns such as overconfidence, so a person or team can forecast better.

````markdown
<context>
A single forecast cannot be judged by its outcome: a 70% call that does not happen may still have been a good forecast. Forecasting skill shows only across many resolved questions. The Brier score (mean squared difference between probability and outcome, 0 is perfect, 0.25 is what always saying 50% earns on binary questions) rewards both calibration (things you call 70% happen about 70% of the time) and resolution (you separate likely from unlikely events instead of hugging the base rate). The log score punishes confident misses much harder. A calibration table needs enough questions per probability bin to mean anything; with a few dozen questions only large miscalibration is detectable. Scores are only comparable across forecasters on the same questions, and easy question sets flatter everyone, so compare with a benchmark: always 50%, or the base rate of the question set.


</context>

<task>
<log>
[FORECAST_LOG]
</log>

1. Log checks: count resolved and unresolved questions, flag questions whose outcome or resolution criteria are ambiguous, and flag non-binary questions that need a different score. Exclude unresolved ones from scoring.
2. Scores: compute the Brier score overall and per forecaster, the log score if no probability is exactly 0 or 1 (say how you handle those), and the benchmarks (always 50% and the base rate of the set). Show the calculation for two rows.
3. Calibration table: bin forecasts (for example 0-10%, 10-30%, 30-50%, 50-70%, 70-90%, 90-100%), give the count, mean forecast and observed frequency per bin, and say which bins have too few questions to read.
4. Decompose if the set is large enough (roughly 50 or more): reliability, resolution and uncertainty, and say what each means here.
5. Patterns: overconfidence or underconfidence, extreme probabilities that missed, topics or time horizons where the forecaster does better or worse, and whether forecasts were updated.
6. How to improve: two to four concrete habits tied to the patterns found (start from base rates, avoid 0% and 100%, widen or narrow, update more often), and how many more questions are needed for firmer conclusions.
</task>

<constraints>
- Compute only from the log given; if outcomes are missing, do not guess them.
- Never call a forecaster good or bad from fewer than about 20 resolved questions; say what the data can and cannot show.
- Compare forecasters only on questions they all answered.
- Do not judge any single forecast as wrong because the less likely outcome happened.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
Three sentences: overall score versus benchmarks, the main calibration pattern, and how much the sample supports it.

## Log checks
Bullets.

## Scores
Table: forecaster | questions | Brier | log score | benchmark Brier.

## Calibration table
Table: bin | count | mean forecast | observed frequency | readable?

## Patterns
Bullets.

## How to improve
Numbered habits.
</output_format>
````

---

<a id="size-seasonal-buy-quantity"></a>

## Size a one-time seasonal buy

`size-seasonal-buy-quantity` · prompt · Forecasting · https://hermes-ide.com/prompts/size-seasonal-buy-quantity

Works out how much seasonal, event or one-shot stock to buy from a demand range, margin and leftover value using newsvendor logic, with pack sizes, top-up options and budget limits.

````markdown
<context>
Christmas stock, swimwear, event merchandise, a festival's food order, a print run: when there is one chance to buy, the right quantity is not the expected demand. Buyers use the newsvendor rule. The cost of having one unit too few (underage, usually the lost margin: price minus cost, plus any goodwill cost) is weighed against the cost of one unit too many (overage: cost minus what the leftover fetches). The critical ratio, underage divided by (underage plus overage), is the probability of not running out that the buy should target, and the optimal quantity is that percentile of the demand distribution. High margin and good leftover value push the buy above the expected demand; thin margin and worthless leftovers push it below. Two common traps: last season's sales understate demand if the item sold out early (sales are censored), and a cheap top-up order later changes the answer, since the first buy only needs to cover demand until the top-up can arrive.
</context>

<task>
<item>
[ITEM]
</item>

<demand>
[DEMAND]
</demand>

1. Set out the economics: underage cost per unit, overage cost per unit, and the critical ratio, with arithmetic.
2. Build the demand range: from last season (uncensoring it if it sold out early, by estimating demand at the sell-out rate for the remaining days), scenarios or comparables. Express it as low, likely and high, or as a mean and spread, and state the assumption.
3. Find the quantity at the critical-ratio percentile of demand (with a normal approximation or directly from the scenarios), and show expected profit at a few quantities around it so the user sees how flat or steep the curve is.
4. Adjust for practical limits: pack sizes and minimum orders (round to the better of the two neighbouring quantities), budget or space caps, and a possible top-up (buy for demand until the top-up arrives, at a lower risk).
5. Give the recommendation with the expected leftover and expected stockout risk at that quantity.
6. Say what would change the answer most: margin, leftover value, or the demand range.
</task>

<constraints>
- Do not invent prices, costs, leftover values or demand figures; ask for any that are missing because the answer depends on them.
- Show the arithmetic and label approximations.
- Treat last season's sales as a lower bound on demand if it sold out.
- Make clear this optimises expected profit; if running out has a cost not captured (a key customer, a safety item), include it or say it is excluded.
- Separate what you verified from what you inferred. Mark inferences as such.
- When you do not know, say "I don't know" once and state what would settle it.
</constraints>

<output_format>
## Summary
The quantity to buy, the expected leftover, and the chance of selling out.

## Economics
Underage, overage and critical ratio with arithmetic.

## Demand range
Low, likely, high (or mean and spread) and the basis.

## Recommended quantity
The calculation and the result.

## Sensitivity
Table: quantity | expected sales | expected leftover | expected profit.

## Practical adjustments
Pack sizes, budget, space, top-up.
</output_format>
````

---

<a id="write-forecast-commentary"></a>

## Write forecast commentary

`write-forecast-commentary` · prompt · Forecasting · https://hermes-ide.com/prompts/write-forecast-commentary

Writes forecast commentary explaining the change from the last forecast with a bridge, drivers, quantified risks, confidence and decisions needed. Use for monthly or quarterly reforecasts.

````markdown
<context>
You are a senior FP&A manager who writes the forecast pack for the executive team. You know what readers want from forecast commentary: the number, how it moved since they last saw it, why, how confident to be, and what they need to decide. You also know what makes commentary useless: restating the table in words, vague drivers ("market conditions"), timing shifts presented as real gains, and risks listed without amounts or likelihoods.
</context>

<task>
Write commentary for this forecast.

<forecast>
[FORECAST]
</forecast>

<previous_forecast>
[PREVIOUS_FORECAST]
</previous_forecast>

1. Establish the comparisons: the new forecast against the previous forecast, the budget or target, and the prior year where relevant. If there is no previous forecast, compare with budget and say so. If figures needed for the headline comparison are missing, ask for them and stop.
2. Build the bridge from the previous forecast (or budget) to the new forecast, separating:
   - actuals versus what was forecast for the closed months;
   - volume, price or rate, and mix;
   - timing (moves between periods that net to zero over the year) versus permanent changes;
   - one-off items;
   - FX or other external factors, if applicable.
   The bridge must sum exactly to the change; any balancing item is labelled "other" and kept small.
3. Explain the drivers: for each material bridge item, the underlying business cause, the evidence (actual results, pipeline, signed contracts, market data) and whether it is expected to persist.
4. Quantify risks and opportunities not included in the forecast: description, amount, likelihood (high, medium or low, or a percentage), timing and owner. Give the resulting range (downside, base, upside).
5. State confidence: which parts of the forecast are firm (contracted, run-rate) and which depend on assumptions, and how forecast accuracy has tracked recently if the data show it.
6. List the decisions or actions needed from the readers, with the date by which they matter.
</task>

<constraints>
- Use only the numbers provided; compute variances and percentages, and check that totals add up. Flag any inconsistency in the input rather than smoothing it over.
- Be specific: "two enterprise renewals (300k) slipped from Q3 to Q4" rather than "timing of deals".
- Call timing shifts timing, and do not count them as improvements to the full-year outcome.
- Keep the headline to what changed and why; do not open with methodology.
- Use consistent sign conventions and state them (favourable shown as positive).
</constraints>

<output_format>
## Headline
Three to four sentences: the new full-year number, the change from the previous forecast and from budget, the main reason, and the overall risk balance.

## Forecast bridge
Table: Item | Amount | Category (actuals, volume, price, mix, timing, one-off, FX, other) | Comment. Ending in the new forecast.

## Drivers
One short paragraph per material driver.

## Risks and opportunities
Table: Item | Amount | Likelihood | Timing | Owner. Then the downside, base and upside range.

## Confidence
Two or three sentences.

## Decisions needed
Numbered list with dates.
</output_format>
````